Construction Hoist SC160/160 33m/min for Building

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Construction Hoist Description


1.Feature: Construction Hoist                       

2.Payload(kg):2*1600                                        

3.Lifting Speed(m/min):33                            

4.Motor Power(kw): 2*2*11

5.Safety Device: 2*SAJ30-1.2                          

6.Cage: Twin                                                  

7.Counterweight: No

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)              

10.Model Number: Type:SC160/160

 

Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist


1.Main construction parts like standard sections, driving cabs are produced in mould.

2.A coat of primer is made over the bare surface before the main painting. This improves the anti-dust ability and ensure longer service life.

3.Material of standard section is 16M steel and gear rack is galvanized. The welding technology is advanced. The connection error of standard sections is very little.

4.Painting of cab, electrical device box is made after acid cleaning and parkerising, to ensure a long usage life.

5.Driving  plate, transmission bracket is of floating connection, which has reduced the vibration and noise effectively.

6.A complete, reliable chain of electric and mechanical safety devices: Door safety switch, breaking-rope protection switch, upper and lower limit switches, limit switches and other electromechanical interlock switches, the overall forging style security protection hook, advanced progressive anti-dropping safety device , odd and even outside-cage, electric lock, emergency stop switches, overload protection devices, as well as the bottom of the buffer and so on. Safety performance meets international advanced standards.

7.Each elevator goes through strict test run before delivery.
 

Construction Hoist Specifiction


Single cage High speed  

Model

Speed(m/min)

Deadweight(kg)

Motor(KW)

Counterweight

Specification(L×W×H)(m)

SC100G

96

1000

3×22

No

2.5×1.3×2.5

SC120G

96

1200

3×22

NO

3.0×1.3×2.5

SCD200G

96

2000

3×15

Have

3.2×1.5×2.5

SC200G

96

2250

3×22

No

3.2×1.5×2.5

SC270GS

96

2700

3×22

No

3.8×1.5×2.5

SCD270G

96

2700

3×18.5

Have

3.8×1.5×2.5

SCD300G

96

3000

3×22

Have

4.0×1.5×2.5

SCD320GS

96

3200

3×22

Have

4.2×1.5×2.5

 Single cage Medium speed 

SC100GZ

63

1000

3×15

No

2.5×1.3×2.5

SC120GZ

63

1200

3×15

No

3.0×1.3×2.5

SCD200GZ

63

2000

2×15

Have

3.0×1.3×2.5

SC200GZ

63

2000

3×18.5

No

3.0×1.3×2.5

SC225GZ

63

2250

2×18.5

No

3.2×1.5×2.5

SC225GZ

63

2250

3×18.5

Have

3.6×1.5×2.5

SCD250GZ

63

2500

2×18.5

Have

3.6×1.5×2.5

SC250GZ

63

2500

3×18.5

Have

3.8×1.5×2.5

SCD270GZ

63

2700

2×18.5

Have

3.8×1.5×2.5

SC270GZ

63

2700

3×22

NO

4.0×1.5×2.5

SCD300GZ

63

3000

3×15

Have

4.0×1.5×2.5

SCD320GZ

63

3200

3×15

Have

4.2×1.5×2.5

 Single cage standard speed 

SC100TD

36

1000

2×11

NO

2.5×1.3×2.5

SC120TD

36

1200

2×11

NO

3.0×1.3×2.5

SC200TD

36

2000

3×11

NO

3.0×1.3×2.5

SCD200TD

36

2000

2×11

Have

3.2×1.5×2.5

SC270TD

36

2700

3×15

NO

3.6×1.5×2.5

SCD270TD

36

2700

2×11

Have

3.8×1.5×2.5

SC320TD

36

3200

3×18.5

NO

4.0×1.5×2.5

SCD320TD

36

3200

2×11

Have

4.2×1.5×2.5

Construction Hoist SC160/160 33m/min for Building

Construction Hoist SC160/160 33m/min for Building

Construction Hoist SC160/160 33m/min for Building

Construction Hoist SC160/160 33m/min for Building


FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the safety device for construction elevator?
Safety guard, safety hook, safety switch (limit switch, limit switch, break cord switch), braking system, overload protection device etc.
Q:How many meters is the wall of the construction elevator?
It seems that there is no, just the local code, you search for the construction elevator acceptance specification look, I have searched this aspect before, now forget.
Q:How to set up the construction elevator?
According to drawings, find the embedded at the scene near the level of architectural axis positioning and high elevation line (50 wire or 1 m wire) location and double-check, axis dividing levels as much as possible in accordance with the size distribution. Find out after each axis, measuring building contour, and map measure the buildings, and building construction drawing contrast, timely transfer measurement results to the designer, designer analyze the error and make changes
Q:What procedures and procedures will be required to re-use after the construction elevator overhaul?
Important parts replacement needs to be changed to the qualification, the procedure is like the new ladder, according to the new ladder standard test.
Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:How many people are there for construction workers
The elevator is a vertical elevator with electric motors, which is equipped with box pods for multi-storey building and carrying goods. There is also a terrace, which is running continuously on the crawler, commonly known as escalator or automatic walkway. A fixed lifting device for the floor. Vertical elevator has a car, running on at least two columns of the vertical or Angle is less than 15 ° between the rigidity of rail. The size and structure of the car is convenient for passengers to enter or unload cargo. Traditionally, the elevator is the general term for vertical transportation in buildings, no matter how they are driven. Speed can be divided into low speed elevator (1 m/s), rapid elevator (1 ~ 2 m/s) and high speed elevator (2 m/s). Hydraulic elevators were introduced in the mid-19th century and are still being used in low-rise buildings. In 1852, the United States developed a safety elevator for wire rope lifting. In the 1980s, there was further improvement in drivers, such as the electric motors, which were driven by worm gears to turn the winding drum and balance weight. At the end of the 19th century, the friction wheel drive greatly increased the lift height.
Q:When does the construction elevator take off?
If the elevator is installed later, can the construction elevator be demolished at this time? It should not be removed because the elevator is used by the local technical supervision bureau. The unused elevator will be fined 5-200, 000 fine and the elevator installation unit will be revoked. No one will take that risk! It is usually done on rooftops, indoors and outdoors, and the materials have been transported upstairs. It is best to be able to remove the elevator when it is finished, so it doesn't affect the progress.
Q:How to save the elevator accident
Expert clew Do not take an elevator with no safety check mark. The elevator person is safe to protect the condition, the passenger has no life danger, after the alarm, the patient wait for the person to help. When emergency situations such as earthquake, fire and elevator water are taken, the use of an elevator should not be used and the emergency passage or staircase should be used instead.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
Layer should be made from steel door frame, Shanghai silk screen, and is equipped with solid and reliable locking device, elevator door layer, the process should be hanging cage crew operations, shall not be under the direct control of elevator lift cage's movement. The net height should not be lower than 1.80 m, and the width of the door should not be greater than 120mm.
Q:The construction elevator relies on what to carry heavy, static hour force point where
Driven by two or three worm gear reducers, the ladder cage is a load bearing unit, and gravity is carried by a rack. At rest, the force point is in the meshing of the gear and rack.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range