Articulated Boom Lift

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
4 Sets m.t.
Supply Capability:
30 Sets Per Month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

GTQZ series self-propelled boom lift

can drive flexibly and freely, with side working scope and high efficiency. Hydraulic motor realize 40% grade-ability through planetary

 reduction box. Telescopic boom and cylinders are protected with dust proof jacket to prevent dust in.

GTQZ Aerial work plaftform application

generally used for temporary, flexible access purposes such as maintenance and construction work or by firefighters

for emergency access, which distinguishes them from permanent access equipment such as elevators. They are designed to lift limited

weights — usually less than a ton, although some have a higher safe working load — distinguishing them from most types of cranes

. They are usually capable of being set up and operated by a single person.

GTQZ BOOM LIFT SPECIFICATION 

Max. working height(m): 17.3

Max. platform height(m): 15.5

Travelling when lifts(kg): 8100(12 boom)

Max. lifting torque(kN m): 2062

Boom length: 12~30(standard configuration 18m)

Working range: 4~29(outriggers extended)

Elevation range: 22~77

Max. lifting height(mm): 27650 (with 30 boom)

Axle base(mm): 2650+1300

Wheel base fromt/rear(mm): 2400/2400

Ground clearance(mm):225

Gradeability(%):21

Min. turning diameter(m): 20

GVW(with 12m boom)(kg): 49700

Outigger type: H type

Machine dimension(without boom)(L×W×H)(mm): 7460× 3315× 3710

Machine dimension(with 12m boom)(L×W×H)(mm): 17150× 3315× 3710

 LIFT

 BOOM LIFT

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
The inspection, inspection, inspection and acceptance of the inspection station shall not be put into operation
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
Supplement: Component members: project manager, safety personnel, inspectors, field director, technical director, foreman, elevator operation (mechanical, electrical installation and maintenance) welders, electricians, scaffolder, etc. The subcontract unit project manager shall have a certificate of construction, and special work shall be given the special work certificate. If the special work certificate is outside the province and province, the construction committee of the construction site should be put on the record.
Q:Does the new approach builder need a localizer test report
Need, not for safety device testing qualified report, inspection agency will not issue the inspection report, in the construction of elevator installation supervision and inspection report, there is a specifically for, for safety device must have testing qualified report, to be certified.
Q:Safe use of construction elevator
In the case of passenger and carriage, the loading shall be uniformly distributed, and the overload shall be strictly prohibited. When the elevator runs to the top and lowest levels, it is strictly forbidden to stop at the collision or lower limit. 7. The driver for leaving hanging basket and while going off work, should be hanging basket fell to the ground, to cut off the total power supply, and the door is locked point, prevent other undocumented workers start the hoisting cage without authorization. Wind up above 6, should stop using the elevator and bring the cage down to the ground. There must be good protection on both sides of the transportation channel. Floor door should be in a normally closed state, its height should conform to the requirements of the specification, anyone shall not open or head out of the door, when the floor door open, the driver shall not start the elevator. Ensure that the communication device is in good condition and the driver should be able to start the lift after confirming the signal. The driver should immediately execute any emergency stop signal on the floor of the operation. The elevator should be installed on a separate ground protection and lightning protection device. It is strictly forbidden to do maintenance work under the condition of the elevator. If maintenance is required, the power supply must be cut off and the sign of "check in, shut off" will be hung in a prominent place.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
The construction diagram of the elevator appears to be a qualified elevator construction unit
Q:How many guides are in the construction elevator
A guide frame on each side of the construction elevator, which is formed by using the section of the standard section in section 1.
Q:How does the construction elevator add up
You can use a ready-made high-altitude operating platform and a high-altitude working platform
Q:How many meters must be installed in the construction elevator search?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:The construction elevator can only go up can't come down what happened
It hasn't risen yet, how it has fallen! Is it a brain teaser?
Q:What is the height of protecting door protection of construction elevator
Currently tunnel door is no national standard, the only industry standards and enterprise standards, is important when choosing the tunnel door manufacturers see manufacturers have tunnel door production qualification and testing report. Formal manufacturer all have these qualifications, such as lei Chen group, tunnel protection door, explosion-proof door the qualification is very complete, you can be important consideration.

1. Manufacturer Overview

Location 2006
Year Established Jiangxi,China
Annual Output Value US$5 Million - US$10 Million
Main Markets South America; East Asia; Southeast Asia; the Middle East; Africa
Company Certifications ISO 9000 ISO 9001

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port shanghai
Export Percentage
No.of Employees in Trade Department 3-5 People
Language Spoken: English
b)Factory Information  
Factory Size: 3,000-5,000 square meters
No. of Production Lines 3
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average