CE Approved ZL06(CTX910) 0.6 ton Small Mini Wheel Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of CTX910:
• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque reserve.
•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.
• Steering system provides flexible steering operation.
•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.
•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.
• Bigger driving axle, 4-wheel drive ensures excellent towing performance.
• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.
•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.
• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.
•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.
• Higher dumping height and biggest dumping reach.
• The front loader frame provides good machine stability and stronger structural strength.
• Rational matching parts, superior machine performance and extraordinary operating efficiency.
• Various optional equipments and buckets can satisfy different needs of customers.
Technical Specifications of CTX910:
FAQ:
1.How about the shipment?
You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
Our quality ensurance time is 3 months. And our engineers can supply overseas service.
- Q:Which one do you guys think will win the intel one has 6 cores while the amd has 8.
- see which process is newer because what companies do is hop each other whoever is last to put one out is usually better then the one who put one out before it
- Q:If so, where did you train, are you certified, what state do you work in, is the work any harder for you because of the fact that you are not as strong as a man? Also, if you recieved training at a special school such as NAHETS, how difficult was it to get a decent job right out of school?I am a female. Thanks.
- I can't work, i'm too young
- Q:A bulldozer lumbers up a hill for 120m. Its instruments show that the hill has an angle of elevation of 38’10’. Find the vertical distance that the bulldozer has traveled and the horizontal distance that the bulldozer has traveled
- The bulldozer goes over the long side of a triangle with a square angle. The angle between the base (horizontal plane) and the hillside is 38° 10' So you want to find the vertical distance : the opposite side of the 38° 10' angle. This equals 120. (sin(38° 10')). Look up the sin in a sinus table. The horizontal distance is 120 s(38° 10')). You can look this up also. Alternatively you can use the formula a^2 + b^2 = c^2 after you have calcultaed the vertical distance.
- Q:I have about 1 acre of former choppy pasture, I first hired an excavator with small dozer guy who left it hacked up, now I want a perfect flat yard and smooth hill and dale. The yard goes right up to the house. I can hire a guy with a brand new D5 (I think they're like $160,000) for 8 hours in one day -- for the same price as a guy with various much smaller equipment for 16 hours, stretched over a week. I prefer to get it all done at once, but wondered if the smaller equipment can refine and fine tune better than the D5. There's a lot to do. Which would you choose?
- The larger equipment can do a better job on the large open area, but you are right, the smaller equipment can fine tune near the house and obstructions safer and easier. If this man owns his equipment he is probably very capable. He might have the skill to leave minimum fine tuning. Talk to both and ask them to tell you how smooth they will get it around the house. Ask if they will leave some work and how much.
- Q:he debuted after wrestlemania 22 only to defeat ric flair at backlash and go on undeafeated he is the bulldozer around raw can you guesss who he is
- UMAGA It's Umaga, the Bulldozer thing gave me an even bigger clue.
- Q:When I was a wee lad, I recall watching a movie about a bull dozer that freaked out, gained its own consciousness, and then started bulldozing people down. What is the title of this movie? It freaked me out when I watched it as a kid, but today, I think I'm finally man enough to watch it.
- I haven't seen this film for decades but did watch its debut showing and the rerun that followed. Sadly, no one has shown this since the Seventies, at least not any channel we've ever had. *sigh* // Wow! Since discovering it on YouTube, I just might watch it tonight!
- Q:It was a bulldozer game where you would try to push the rocks on to the bullseye with the bulldozers. I believe it was for windows 95
- Here okorder /
- Q:I am selling a bulldozer but I don't know what are the specifications of it
- Best bet would be manufacturer's website, or maybe a dealer in your area.
- Q:Bulldozer with chain and with wheel for open caste mining
- manindra
- Q:Car rear end, the reason is not in front of a bulldozer tail lamp, who is responsible for the night.
- The same to scratch the traffic accident1, a party in the lane change process in the same direction scraping traffic accident, change lane side bear full responsibility;2, one side over the other side of the formation of the same scraping traffic accident, and the other side in the lane normal driving, the faster the party to assume full responsibility;3, a super wide and failing to set a clear warning signs, to scratch the traffic accident with another party beyond the process of the formation of ultra wide, secondary responsibility for the accident party, the other party the main responsibility for the accident;4, a super wide and with the other party in parallel or beyond the scratch the traffic accident the other party in the process of super wide shall bear the full responsibility of the accident;5, one side in the driveway to stop the formation of the same direction scraping traffic accident, parking side according to regulations opened the dangerous warning flash, and set a warning sign, the other party bear the full responsibility for the accident;6, one side parking in the driveway, forming the same direction scraping traffic accident, the parking side does not according to regulations open dangerous warning flash and set warning signs, both sides bear the same responsibility for the accident.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CE Approved ZL06(CTX910) 0.6 ton Small Mini Wheel Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords