High Quality Cuplock System Scaffolding with Hot Dip Galvanized Surface Treatment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description
Why choose us
1. professional scaffold manufacturer
2. timely delivery
3. authorty certification
4. technical support
5. 8 years' experience
6. 6S management
products size :
standard 48.3*3.2 mm
ledger 48.3*3.2mm
brace 48.3*2.5mm
Any size can be specificed
Packaging & Shipping
We ensure your goods can be delivered safely:
1.Experienced packer and technician
2.Standard rack
3.Long-term cooperative freight forwarding and shipping company
Our Services
Rapid Scaffolding takes pride in offering a team of highly experienced and suitably qualified engineering and technical experts. According to different requests from all our customers, we can provide a whole range of scaffolding and formwork designing, we also provide the total solutions for any project.
Company Information
Certificates
As a professional scaffolding manufacturer for years' experience in China, we have obtained many certification authority, including ISO9001:2008, ISO14000, CE, OHSAS18000 and our products are also tested to meet USA standard (ANSI A10.8), Australia/New Zealand standard, Japanese standard.
Inspection
We have a strict quality control system based on the security awarness and the practice. According to the requirements of ISO9001:2008, we examine the products through the whole production from the raw material to the final products.
FAQ
What we are doing to ensure the high quality?
1. Introducing quality assurance into projects at the earliest stage by continued planning, including comprehensive inspections.
2.Maintaining the highest level of employee skills by the continual assessing and training of all employees.
3. Maintaining a working environment based upon trust, respect, teamwork at all levels within the company.
4. Effectively communicating and encouraging feedback with our clients, sub-contractors, suppliers and consultants to constantly improve our quality and compliance standards.
5. A professional quality control team involves in everyday production.
Any interest or questions,welcome to contact us.
Any inquiry will be replied within 24 hours.
- Q:Tell me how much the shear strength can reach MPa, thank you
- The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
- Q:how much does a scaffold/industrial piercing cost in the US????i really want one. i know it'll probably hurt.do i have to go to a tattoo/piercing place to get it?i live in europe and here it costs 70 euros which is like $105ish. don't want to pay that much.
- Depends on where you live- I live in Michigan and the tattoo parlors around here are $25.00 for all peircings above the waist. I dont think Ive seen anywhere for more than that. But if you live in California or Florida, it will probably be more because its a big tourist/spring break spot and a lot of college kids get tattoos/peircings on Spring Break, so they jack up the price of everything
- Q:I'm asking this in favour of my friend who currently has no internet.She had her scaffold piercing done about 2 days ago and today it got knocked and started bleeding. It's been bleeding for about 3 hours now and she's worried about it.
- First you gotta stop touching it, that's probably causing the irratation, hence bleeding. IT'll take time to heal, just leave it alone clean out the blood every hour or so, BE CAREFUL! and LEAVE IT IN!
- Q:The bowl buckle scaffold allows the joint to be in a section
- Look at the situation, the ground is not flat,
- Q:Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
- I had a monroe piercing about 2 years ago. I think they look fab (little twinkling diamond sort). I went to a fully licenced piercing shop. They will draw a dot and ask if it's in the right place. Then a spray or numbing cream is applied inside and outside of the upper lip. The area is tightly clamped and a piercing is made with a sterile needle. Then the stud is inserted. The back (flat disc) is then screwed onto the bar. The process takes only a matter of minutes and you'll feel a second of pain that's all. Aftercare: Bath area with salted distilled water or even better Savlon Wound Wash after 2 weeks you need to visit the shop for a smaller bar to be inserted as the swelling will have gone done. Unfortunately my piercing never healed right (don't let that put you off as I do have very sensitive skin and reactions to all sorts of things) and it always looked a bit like a red zit so I decided to take it out. Also be prepared for very mixed reactions as some liked it and others hated it. Anyway good luck girl, go and get it done :)
- Q:Thinking about getting this peircing done next. I got my first and second peircing on my lobes and neither hurt at all to me (like .5 out of 10). How much does industrial hurt out of 10? Is it a similar pain to lobe peircing? Also how long does it take to heal, until you can take it out and sleep on it?
- For me, I'd rate it's pain level at about a 5. Just all depends on how well you tolerate. It's more uncomfortable than getting a lobe piercing, really not that similar. Mine took about about 6-8 months to heal for changing the jewelry, but took like maybe 2-3 months until I was able to sleep on it again. Good luck if you get it.
- Q:im in the midwest
- about a buck a foot I think
- Q:The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
- Assuming that the web is N, the calculated load is P=1.2*N+1.4*n (n)That support is a layer of a layer of wood longitudinal transverseThen calculate vertical
- Q:What is scaffolding in the psychology field?
- I have been a Psychologist for nearly 20 years...and I have never heard this term.
- Q:how much does a scaffolding business earn a year?
- The amount earnt very much depends on the size of the business, contacts within the industry, membership of industry associations and the country that you are operating in.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
High Quality Cuplock System Scaffolding with Hot Dip Galvanized Surface Treatment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords