• Aluminum Double Width Scaffolding with Inclined Ladder System 1
  • Aluminum Double Width Scaffolding with Inclined Ladder System 2
  • Aluminum Double Width Scaffolding with Inclined Ladder System 3
Aluminum Double Width Scaffolding with Inclined Ladder

Aluminum Double Width Scaffolding with Inclined Ladder

Ref Price:
$194.00 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.    Structure of Aluminum Double Width Scaffolding

 

Tested and complies with Australian&New Zealand Standard 1576.3

Light weight for easy setup and use

8 inch wheels for easy maneuverability

Wide tower for specious work area,for tools and materials

Superior grade aluminum construction

 

2.Aluminum Double Width Scaffolding advantages:

  1.  

  2.  

  3.  

 

3. Aluminum Double Width Scaffolding Products pictures:

 Aluminum Double Width Scaffolding with Inclined Ladder

4. Aluminum Double Width Scaffolding Specification:

 Aluminum Double Width Scaffolding with Inclined Ladder

5.FAQ

We have organized several common questions for our clients, may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

-Whole Aluminum Scaffolding

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q: The gearbox is good or the iron is good 490
Before seeing these two issues, the scaffolding is also very strange, so deliberately on the Internet to search these two issues
Q: High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
product description apf-405 from Viscoelastic modified asphalt waterproofing membrane is a kind of high quality, high polymer waterproof sheet excellent performance, polyvinyl chloride resin or plasticizer, anti-ultraviolet agent, anti-aging agent, stabilizer and processing aid to join, The polymer waterproof film was produced by extrusion molding
Q: Clothes rack stainless steel is good or good aluminum
First, the "Safety Production Law" (Ninth National People's Congress 28 times) Second, the "Construction Safety Production Management Regulations" (State Council Decree No
Q: Housing maintenance works wall maintenance, the use of mobile scaffolding, I would like to ask how this scaffolding generally calculate the cost? Thank you I'm doing the project budget
Generally divided into single row scaffolding, double scaffolding and full house scaffolding
Q: Puma skates with PP plastic stents and aluminum stents why plastic than aluminum is also expensive ah? In the end which is better? More
Not tested or tested unqualified shall not be used 5 demolition operations must be carried out from top to bottom, is strictly prohibited from top to bottom at the same time operations Sub-demolition of the height difference should not be greater than two steps With the wall bracket with a wall bracket, the connector must be removed with the bracket layer, is strictly prohibited to remove all or several steps before the removal of the bracket 6 unloading should meet the following requirements: It is strictly prohibited to pipe, fasteners thrown from the height to the ground Second, as China's market economy system is increasingly perfect and the continuous expansion of foreign trade, to a large extent will make our products to participate in greater competition in the market, and to make fasteners and products at home and abroad The market a firm foothold, both "keep alive", 7 operating layer on the construction load should meet the design requirements, not overload Scaffolding can not be connected with the template bracket 8 stencil bracket during use, shall not be arbitrarily removed rod When the template support base or adjacent to the equipment at the base, the trench, the use of the stent in the process shall not be excavated, or must take 9 reinforcement measures
Q: Scaffold metal fittings are good for stainless steel or aluminum
You say me - chest - big trouble, wrong ah;
Q: Two-wheel skateboard and aluminum alloy bracket which is a good point? Why are the same price is different
Do not need expert argument, need expert demonstration scaffolding range: (a) erect height of 50m and above floor-type steel scaffolding works. (B) to enhance the height of 150m and above the attachment of the overall and fragment lift scaffolding works. (C) height of 20m and above the cantilevered scaffolding works. According to the "more dangerous part of the project safety management approach"
Q: Ceiling decoration scaffolding is what material, aluminum alloy material is good?
Let's say cast iron! The advantage is high strength, for the strong environmental capacity, suitable for high-strength conversion. The disadvantage is that the raft side Wo drums Boka Boka weight increases, so that the front engine of the car, when the rapid turn difficult to control, there is a car weight is increased, the increase in fuel consumption ~ ~ ~ aluminum Engine, light weight, the first said above the rapid turn difficult to control the performance, certainly better than cast iron!
Q: Why all the ultra-pole all use aluminum alloy shell?
Flexible waterproof on the market. Choose a little bit of expensive price.
Q: As if there is mine grounding, what information do I have to do? How to do it? Thank you more
Is the same, according to the raw material flame retardant board and ordinary board.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords