Scaffolding Aluminium Profiles Construction

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Customized Scaffolding Aluminium profiles

1. What kind of products and service we can provide:

  • Aluminium profiles for construction, such as doors, windows, fence, screen, curtain wall, handrail, partition, wardrobe, greenhouse and sunroom, etc.
  • Industrial Aluminium profiles for scafolding, ladder, solar energy, LED, machinery, advertisement, transport, auto part, exhibit shelf, telecom. etc.
  • Doors and Windows System, include sliding door, side hung window, tilt and turn window, etc.
  • Machining for aluminum and S/S products: Cutting, drill holes, punch, milling, deburr, chamfer, stretch bending, welding and so on;
  • Stainless Steel Welded Tubes
  • Engineering design and Consult.



Alloy:  6005, 6082, 6061, 6063, 7075 etc.

Surface treatment

Mill finish, powder coating, anodizing, sandblasting, electrophorsis etc.

Deep precessing ability

Drill hole, stretch bending, milling, welding, fabrication etc.

Time of sample

15-20days, including makeing mould


 Above 0.7mm or customized.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:To warm the design and construction of the heating tube-intensive area spacing is less than 100mm, the external should be flexible sleeve Will the role of flexible casing is what Thank you
Mainly the evaporator is dirty or the filter is dirty
Q:Made a sniper rifle total length of about 1.5 meters ~ aluminum tube ~ 400 more to buy the sight of the mirror and stent ~ gun dragged with aluminum and screw decoration ~ no
First, the external wall insulation variety, the traditional external wall insulation, by the polymer mortar, glass fiber mesh, flame retardant molded polystyrene foam board (EPS) or extruded board (XPS) and other materials Into, on-site bonding construction
Q:Clothes rack stainless steel is good or good aluminum
First, the "Safety Production Law" (Ninth National People's Congress 28 times) Second, the "Construction Safety Production Management Regulations" (State Council Decree No
Q:How to Measure and Calculate the Flexible Pipe Deformation Rate
The part price is about 2.5 times that of iron.
Q:Two-wheel skateboard and aluminum alloy bracket which is a good point?
So as long as there is no weight to press it or have a hard hit it, it is not frivolous
Q:What is the pros and cons of the cast iron engine and the aluminum alloy engine?
Air conditioning without heating the case, compared to other heating methods, the air conditioning power. When the ambient temperature is 5 degrees or more (the inverter air conditioner is slightly better and can be above ambient temperature -15 degrees) "Air conditioning is the most efficient and consumes about 1000 watts of electricity in all heating products, producing about 3000 watts of heat Power and have a better effect. "If you feel the room cool off, one hour hot and open an hour this will be more costly. Both healthy and energy-saving approach is to reduce the indoor and outdoor temperature difference. In order to set the temperature of the air conditioning, do not be higher than 20 degrees, set the best 17 degrees. Summer set air conditioning cooling temperature, neither less than 26 degrees, and not less than the indoor temperature of 3 to 6 degrees. Such as indoor temperature 30 degrees, set 27 degrees; indoor temperature 35 degrees, set 29 degrees.
Q:Does the taller children's roller shoes have aluminum stents? Shop description zz3 is aluminum stent, but we are here that the store is plastic stent.
Note that there is generally a middle of the waist, that is, protective railing General scaffolding step is 15 meters, there are 18 meters, it is decoration scaffolding Return to the topic, know what step is to understand the top step, is the scaffolding scaffolding the last step General cantilevered scaffolding will involve the top of the top step need to take a long pole, because there will be a pole to prevent the next layer of cantilevered arrangement So the need for short steel pipe in the top step to use long
Q:Roller skates PP plastic stent with aluminum stent which is good
W-type non-bearing cast iron drainage pipe and pipe fittings products are based on GB / T-2008 "flexible interface with cast iron pipe, pipe fittings and accessories" standard production
Q:What scaffolding in interior decoration can give a construction plan? Thank you
Haier gas water heater Product Code: GD0N5100W00GJCAA. which is a production model and coding, does not represent the date. One of the joints of the gas inlet is rusted. Store in the reservoir area. Moisture may be caused by the production process. The production of the joint itself is not caused by the oxidation process.
Q:There are those children's roller shoes is one of the aluminum alloy stent,
Try to use other fireproof materials, do not think there is no hidden place on the use of such materials can be burned

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range