alum. air diffusers

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Square Ceiling Diffusers


Square Ceiling Diffusers are designed to provide excellent directional performance typically in a 4 way airfow pattern.

The Louvre Face Diffuser is generally flush mounted to the ceiling line. This frame style is extremely versatile and is ideal for a lay-in application where the diffuser is placed into a T-Bar ceiling grid. The Louvre Face Diffuser may be used in place of a modular ceiling tile without any need arising to alter the T-bar construction.

It is easy for installation with its removeble core.

Ceiling diffusers blend seamlessly into modern office and commercial building ceilings.


Materials: Aluminium

Construction; Frames have punched in corner, in addition to welded joints.

            Welded blade cores.

            Aluminium tube supports blade cores inside frame.

Core: Removable with safety cord/ chain under

Color: Standard- RAL 9010 RAL9016 or Anodized

Opposite Blade Damper Optional

Standard Size:

Neck Size 145*145 Face Size 295*295 Height 51.2

Neck Size 220*220 Face Size 370*370 Height 51.2

Neck Size 295*295 Face Size 445*445 Height 51.2

Neck Size 370*370 Face Size 520*520 Height 51.2

Neck Size 445*445 Face Size 595*595 Height 51.2

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range