Air diffusers air flow vent for HVAC systerm America Market

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

 1

Item

HVAC aluminum air conditioner grille

 2

Materials

Extruded Aluminum alloy (6063-T5)

 3

Blade

Blades in 45°from aluminum profile or as customer’s requirements

 4

Bar spacing

30mm as standard or as customer’s requirements

 5

Materials

0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 

 6

Surface Finish

Powder coated, Anodized , PVDF, Mill finish.

 7

Size 

Width x Height, any sizes available

 8

Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.

 9

Color

Refer to RAL colors swatch or customized colors available

 10

Design

Drawings designed according to the customers’ requirements

 11

Payment terms

T/T, L/C, PYAPAL, etc.

 12

Delivery time

Usual 15-20 work days for a 40GP container 

 13

Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 

 14

Mesh

Stainless steel security mesh, Aluminum security mesh

 15

Type

Fixing and adjustable installation

 

Usage of Air Diffuser

 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

Air diffusers air flow vent for HVAC systerm America Market

Air diffusers air flow vent for HVAC systerm America Market

Air diffusers air flow vent for HVAC systerm America Market

Air diffusers air flow vent for HVAC systerm America Market

Air diffusers air flow vent for HVAC systerm America Market

Air diffusers air flow vent for HVAC systerm America Market

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Owners in the decoration before the obligation to suppress the warm
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
Q:What kind of equipment is the protection of the fan coil in the ground source heat pump?
First of all to tell you that the fan coil is Japan SINKO Xinhuang fan coil unit, the new source in this area of the configuration system is quite good. There is something else, it can be said that the day of the promotion of the new source of the ground is really the top of the configuration.
Q:New house can not keep warm in winter?
Since the "have to pay half of the money, and this winter is not to stay, apply for warmth, then they are not responsible for the warmth of frozen," then change the idea to solve, do not have to spend more time with their children wasting: warm is not easy to crack, but do not rule out extreme case. To understand: there is water in the warm tube is the key, easy to freeze. Solution: the home of the warm system and the external system to isolate the household valve closed (preferably in the demolition of the valve joints plus a wire plug to prevent the valve from the external system out of water), and then please use The air pump blows out the residual water of the home heating system, so there is no moisture in the whole system, and it is not afraid to warm the crack.
Q:What are the disadvantages of carbon fiber heating panels?
Q:Rooftop electric film from the heating how?
In the early years, many of the time to do so, but the effect is not good, are now doing on the ground.
Q:To warm or water pipe leakage from the time of the warranty period
To warm or water pipe leakage from the time of the warranty period...
Q:What is the difference between a system furnace and a single heating furnace in a boiler
Have
Q:Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
Q:To warm the construction, structure and filler selection and how to coil?
My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat...
Q:What are the ground construction practices for ground heating systems?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range