• ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 1
  • ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 2
  • ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 3
ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale




ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale



 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC100
Rate piling pressure(KN)1000
Piling speed(m/min)Fast10.0
Low2.0
Piling stroke(m)1.6
Pace(m)Longitudinal1.6
Horizontal0.5
Angle range(°)15
Rise stroke(m)1.45
Square pile(mm)Max350
Circle pile(mm)Max350
Side piling(mm)450
Corner piling space(mm)900
Lifting weight(t)8.0
Pile hanging length(m)12.0
Power(KW)Piling37
Lifting11
Main dimension(m)Work length6.65
Work width4.20
Transpot height2.70
Total weight(t)100

 

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

1,Are you trading company or manufacturer?We are professional manufacturer, and our factory mainly produce water well drilling rig, core drilling rig, DTH drilling rig, piling rig, etc. Our products have been exported to more than 50 countries of Asia, South America, Africa, and get a good reputation in the world. 

 

2,Are your products qualified?Yes, our products all have gained ISO certificate,and we have specialized quality inspection department for checking every machine before leaving our factory.  

 

3,How about your machine quality? All of our machines hold the  ISO, QC and TUV certificate, and each set of machine must pass a great number of strict testing in order to offer the best quality to our customers.

 

4,Do you have after service?Yes, we have special service team which will offer you professional guidance. If you need, we can send our engineer to your worksite and provid the training for your staff.

 

5,What about the qaulity warranty? 

 

We offer one-year quality warranty for machines' main body.

 

6,How long can you deliver the machine? 

 

Generallywe can deliver the machine in 7 days. 


 

Q:The ground site must be driven by a pile driver
If the foundation is made of prefabricated piles, it must be driven by a pile driver. If it is a pile, it will not need a pile driver.If it is an ordinary low rise house or a general pavement foundation, it only needs to be treated by damp proof and hardening, without piling.
Q:What should I pay attention to when purchasing a hydraulic pile driver?
Enough to buy a pile driver, first of all, you should pay attention to the design you want to receive, tonnage and pile specifications.In order to understand what type of machine?Most of us here in Hunan don't pay the full amountYou can talk about it in detail.
Q:Which is better for the building foundation treated by a pile driver and a rammer?
Compaction can not deal with: 1. around the fear of loess foundation soft soil /2. /3./ fall of vibration building. But the cost is cheap. The long-term effect is good.Piling can basically cope with any situation, but the cost will be high
Q:How many types of piles are there in the site? What procedures are usually used for piling? Such as eyes open what kind of..
Precast pile, artificial dig hole pile, sinking pipe filling pile, spiral drilling pouring pile and powder spraying pile.
Q:Which price is low for a pile driver?
Specializing in sales of steel sheet pile, steel sheet pile construction, leasing, model complete, high quality, the construction of steel sheet pile, the price is more favorable, and exquisite design, honest and trustworthy business purposes, in full accordance with the market-oriented, large-scale, standardized operation requirements specification, through the implementation of brand strategy to build the core competitiveness of enterprises
Q:Rules for operation of impact pile drivers
Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.
Q:How to maintain the pile driver daily?
(4) dealing with leakage and damage of hydraulic system in time. (5) count the tools and scrub them clean. Fill in the equipment operation record, and make the writing clear, neat, complete and accurate.First level maintenance: (120~150 hours per work) on the basis of the completion of the maintenance of the whole work of each class.
Q:My home behind the plant in piling, the distance is about 25 meters, when piling not only hear the sound, even the house seems to be in the earthquake, how many distance from the house safe?
We also met this kind of situation, homeowners simply forced the construction team construction method (modified by rotary drilling operation).
Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
Often it is easy to wear stone blade but this thing a shovel blade is dozens of pieces of money I play this machine for many years I was in Jiangxi Ganzhou Hebei Shun Machinery Factory bought machine but then buy is 60 cm in diameter of the machine is very good quality basically not straight holes emptying the shovel in my experience this machine is vulnerable parts of the wire rope and hoist brake belt and motor belt but these are very cheap hardware stores are sold. 80 cm I have not used but I use 60 cm hit a ten meter hole in 40 minutes the course you have to hoist operation very skilled ah Hey this is my actual experience you want to help
Q:Why should I pull it up a few times? Because the friction should stop gradually
This problem is very simple, you just don't know it. The working principle of diesel hammer, hammer force pull up several times in the ignition, ignition after diesel combustion explosive can put the hammer from the top, the hammer reaches a certain height to fall under gravity, in the moment of contact pressure the light diesel (compression diesel can make its combustion is its characteristics), and was the top hammer, again and again.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords