XLPE Insulated Electrical Power Cable CMAX

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m
Supply Capability:
1000000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Standard:National Standard GB/T12706-2008/IEC60502,AS/NZS,ICEA, ASTM etc

    

2.  Rated Voltage: U0/U: 0.6/1kV~26/35kV

 

3.  Construction :

Conductor

Compact Stranded Copper Conductor, Class 2 as per IEC 60228

Circular solid Copper Conductor, Class 1 as per IEC 60228

Flexible Stranded Copper Conductor, Class 5 as per IEC 60228

Conductor Screen

Semi-conductor (MV only)

Insulation

XLPE(Cross-linked polyethylene)

Insulation Screen 

Semi-conductor (MV only)

Separate Screen 

Copper Tape (MV must, LV optional)

Filler

PP Yarn, or Paper

Wrapping Tape

PP

Inner Covering

Extruded PVC (MV only)

Armour

Steel Wire, or Steel Tape, or Aluminium Tape optional

Overall Sheath

PVC or PE

 XLPE insulated electrical power cable

4.  Application:

Suitable for use in power distribution lines or fixed installation with rated voltage between 0.6/1kV~26/35kV

 

5.  Operating Characteristics:

Max.permission conductor continous operating temperature of conductor;90 °C

Max.short-circuit temperature of conductor shall not exceed 250 °C (5s maximum duration)

The ambient temperature under installation of cable should not below 0 °C

The  bending radius of a single-core cable should not less than 20 times of outer diameter of the cable

The  bending radius of a three-core cable should not less than 15 times of outer diameter of the cable

 

 

XLPE insulated electrical power cable  

 

  6. Hengtian cable production line

  •    PVC electrical wire

  • power cable from low voltage 0.6/1kv to 110kv

            PVC insulated PVC sheathed electrical power cable

            XLPE insulated PE/PVC sheathed electrical power cable

            fire resistance electrical power cable

            LSZH electrical power cable            

  • control cable(cable material can be PVC, Fluoroplastic,rubber or with customer design)

  • Twisted pair shield instrumentation cable

  • rubber sheathed cable

  • mining cable

  • aerial bundled cable

  • elevator cable

  • RF coaxial cable

  • stranded bare conductor

special cable  : with our own research and development team, Hengtian cable can work with you on common products but also your new designs. 

FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The difference between power cable and control cable
Difference 1: power cable in order to reduce the voltage drop on the wire in general wire diameter, control cable to take a small current control signal line diameter can be fine. This is based on the use of the request. Thick line of high cost, the line is not good to go. So in the margin, to ensure the use of security in the case of sufficient diameter on the line. Difference 2: wire thread is different. Power cables require linear compressive strength, tensile strength, temperature resistance, corrosion resistance. Control cable requirements are relatively low. Difference 3: power cable core number less, a single core, two core, 3 core, 4 core (three-phase four-wire system), 5 core (three-phase five-wire system). Control cable core number more, from 2 core ~ 61 core, or even more. Control cable also uses a variety of core structure, shielding and other measures to obtain a satisfactory electromagnetic compatibility.
Q:Can building lighting lines go to a layer of leveling?
Construction of buried pipelines, lighting generally take the top of the floor, low-position socket to take the ground floor, high-level socket to take the top of the floor, which is built during the construction of the embedded program. Architectural lighting categories: 1 workplace should be set to normal illumination. 2 Workplace The following conditions should be set to emergency lighting: 1) normal lighting after the failure to extinguish, to ensure that the normal work or activities to continue the skills of the place, should be set up standby lighting; 2) normal lighting due to failure to extinguish, to ensure that the potential danger 3) normal lighting due to failure after extinguishing, to ensure the safety of evacuation of the export and channel, should be set to evacuate the lighting. 3 large area should be set on duty lighting. 4 Where there is a realm of the task, the guards should be set up according to the requirements of the guard. 5 Buildings and structures that endanger the safety of navigation shall be provided with obstruction lighting according to rigid requirements.
Q:How to calculate the amount of cable works
Mainly to see what equipment, if the bus system, at the intersection of the wiring even read, your algorithm is completed. Wiring specifications consistent color on the line ah.
Q:Trouble everyone to see, I like this computer configuration is good or bad!
Called plastic terminal, there are four points, six points ....... and other sizes; if the iron pipe, there are ...50 and other sizes.
Q:Why does not the birds stand on the high voltage line
110 cable and 4 pairs and 5 pairs of modules
Q:Pneumatic nail gun installation installed wire trunking easy to use it
What do you say? The The Theoretically can see. The The
Q:Power cable and control cable how to distinguish
Power cable is a strong power, the control cable is weak
Q:Can the cables in the factory be laid directly?
The problem itself is not clear, what plant? Direct laying the concept? So qualitatively reply as follows: . usually, the factory cable laying can be cable bridge, bracket, cable trench, casing buried, etc. implementation. . to power engineering, for example, please see GB-2007 "power engineering cable design specifications" fifth part.
Q:What are the precautions when installing the shower room?
2No49-98 years in order to enable readers to understand the relevant requirements before the R & D and manufacturing, and its signature, structural requirements and safety testing of the three major Make the following description and description
Q:Dark line into the mud how to solve the mud
You say this situation, in the modern building concealed line building is a more common problem, cement casting before the embedded pipe due to the late construction caused damage, in general, more PVC pipe, since it is galvanized iron First, the pipe wall will not be destroyed, you can not consider the main problem is the pipe and the pipe interface is not strong, there are gaps, the market directly, bending, three links are only locked with a nut Of the method to be fixed in the cement slurry with the role of vibration rod, the liquid slurry on the seamless, the most simple and effective way is in the interface before the nozzle first marked with a layer of glass glue, with the lock after the nut, With a transparent tape wrapped around the solid, over the beam, with fine wire to tighten the wire tube and barbed together, after casting, immediately with fine steel wire through the experiment, found that the block, timely treatment. As for the junction box blockage is easier to handle, embedded in the junction box before: . in the next box position on the paint applied to the template, easy to cement after solidification, remove the template to find a box convenient. . with the wood chips to fill the box filled, transparent tape wrapped around the solid, easy to clear after the box, but also to prevent the junction box into the pulp. . is the junction box and the building of the wall or ribs with fine iron wire tie to prevent the cement casting "floating box."

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range