Tower Cranes Topless Flat-top QTZ50(PT5010)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ50(PT5010) Description

Feature: Tower Crane                    Condition: New 

Application: urban construction      Rated Loading Capacity: 4T 

Rated Lifting Moment:400KN.M      Max. Lifting Load: 4T 

Max. Lifting Height:120M                Span:50M 

Model Number: QTZ50(PT5010)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: White/ Blue

After-sales Service Provided: Overseas third-party support available 

QTZ50(PT5010) Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTZ50(PT5010) Specification

Tower Cranes Topless  Flat-top QTZ50(PT5010)

QTZ50(PT5010) Pictures

Tower Cranes Topless  Flat-top QTZ50(PT5010)

Tower Cranes Topless  Flat-top QTZ50(PT5010)

Tower Cranes Topless  Flat-top QTZ50(PT5010)


QTZ50(PT5010) FAQ

Q: How many meters of the steel wire rope?

A: For normal model, the length of the rope is 100 meters. But we could produce the length according to the customer’s request. 


Q: What is the difference between working wire rope and safety wire rope?

A: There are two kinds of rope using for suspended platform, working wire rope is for working up and down, the other is safety wire rope, just for safe, if the working wire rope broke and fell down, the safety wire rope will locked  immediately. 


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
Surface wind speed is greater than 6
Q:Is the tower crane a special type of work?
it belongs to the high-altitude workers, not the special workers, what is the tower crane talent network is a platform for the exchange of tower.
Q:What are the requirements for jack up and plus section of jack up tower crane?
When lifting, a standard section is hoisted on the imported beam or introduced platform. Then open the pins or bolts connecting the standard section with the slewing support. Start the oil pump, so that the cage in the standard section of the outward sliding, until the release of a standard section position, and then imported beam or imported platform on the standard section into the connection. This completes a process.
Q:What are the four major moving mechanisms of a tower crane?
Four big bodies of tower crane: lifting, slewing, luffing and walking.
Q:What is an attached tower crane?
Attached tower craneAttached tower crane is arranged close to the building, the tower by themselves to rise up with the increase of buildings and roof, tower, every 20m with attachment support device, the tower body is fixed on the building, in order to maintain stability. Figure 11 is a QT4 - 10 self - elevating four - tower crane (attachable, stationary, walkable, and climbing).
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range