Tower Cranes Topless Flat-top QTZ50(PT5010)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ50(PT5010) Description

Feature: Tower Crane                    Condition: New 

Application: urban construction      Rated Loading Capacity: 4T 

Rated Lifting Moment:400KN.M      Max. Lifting Load: 4T 

Max. Lifting Height:120M                Span:50M 

Model Number: QTZ50(PT5010)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: White/ Blue

After-sales Service Provided: Overseas third-party support available 

QTZ50(PT5010) Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTZ50(PT5010) Specification

Tower Cranes Topless  Flat-top QTZ50(PT5010)

QTZ50(PT5010) Pictures

Tower Cranes Topless  Flat-top QTZ50(PT5010)

Tower Cranes Topless  Flat-top QTZ50(PT5010)

Tower Cranes Topless  Flat-top QTZ50(PT5010)


QTZ50(PT5010) FAQ

Q: How many meters of the steel wire rope?

A: For normal model, the length of the rope is 100 meters. But we could produce the length according to the customer’s request. 


Q: What is the difference between working wire rope and safety wire rope?

A: There are two kinds of rope using for suspended platform, working wire rope is for working up and down, the other is safety wire rope, just for safe, if the working wire rope broke and fell down, the safety wire rope will locked  immediately. 


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do cranes live in Ohio?
yes
Q:Ask about the lift and transportation of the jack up tower crane
If it implements specialized subcontracting, it shall be organized by the subcontractor. Led by the security establishment or technician, audit professional and technical personnel to audit the Organization Department of the unit by unit technology, construction technology, safety, quality and other departments, and ultimately approved by the signature of the person in charge of enterprises (393 orders), and the general contractor technology are also responsible to approval.
Q:Biblical meaning of a crane?
The crane looked at you and thought who the hell is she yelling at?
Q:Stephen Crane short stories?
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
Q:what is the common material using for crane boom?
Most aerial cranes (Erickson Skycrane) are used for tasks such as remote location work or expedious work. It takes awhile to erect a crane for one air conditioner unit to be replaced on top of a 5 story building or to replace a cable on a wire bridge. They are also widely used for fire supression.
Q:i am a student of class 12 can anyoone tell me how do i make a project on an electromagnetic crane?
act ur age man i did that project when i was in 6th
Q:What do crane flies eat?
Adult crane flies do not eat at all; most adult crane flies only mate and then die. Crane fly larvae are called leatherjackets or 'leatherjacket slugs' because of the way they move and eat roots (such as those of grass in lawns) and other vegetation.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:Moment Problem, Help! A crawler crane of 10,000N weight, has a 20-M boom weighing 1000N acting midway....?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range