Tower Crane TC7135 Double-trolley Type

Ref Price:
$40,000.00 - 200,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details of TC7135 tower crane


Feature: Tower Crane

Condition: New                                           

Max.Lifting Load: 16T

Span: 71m                                             

Place of Origin: China(Mainland)              

Model Number: TC7135         

 

 

Packaging & Delivery of TC7135 tower crane


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Specifications of TC7135 tower crane

 

● Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

 


● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.


● Take double-trolley type, greatly enhance lifting performance.


Free standing height (m)

50

Max height with attachment (m)

200

Working range can be adjustedm

5055606571

Min working rangem

2.5

Max lifting capacityt

16

Tip load @ 71mt

3.5

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

04

08

08

016

Speedm/min

080

040

040

020

Motor

YZPBF280-8-55KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

95

Power supply requirement (KVA)

255KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V  260A

Rated working voltage & current

380V  146A

Images of TC7135 tower crane

 

 

FAQ of TC7135 tower crane

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically,
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:How to select tower crane type according to the height of building? Seek explanation
The building cornice height within 20m, the building area of each floor within 2000m2 with 800KN.m tower crane 1 units, each increase of less than 1600m2 800KN.m 1 tower cranes;The building cornice height is less than 50m, the building area of each floor within 2500m2 with 1000KN.m self lifting tower crane 1 units, each increase of less than 2000m2 increased 1 1000KN.m self lifting tower crane;The building cornice height is less than 100m, the building area of each floor within 3000m2 with 1500KN.m self lifting tower crane 1 units, each increase of less than 2500m2 increased 1 1500KN.m self lifting tower crane;The building cornice height is above 100m, the building area of each floor within 3500m2 with 1 2000KN.m self lifting tower crane, each increase of less than 3000m2 increased 1 2000KN.m Jack 1 cranes;When the eaves height more than 25m below the 100m, according to each self lifting tower crane with 1 single cage construction elevator, eaves height above 100m with 2 single cage construction elevator;The podium when every floor area is too large, in accordance with the above standard auxiliary tower crane.
Q:What are the construction cranes? 50
Tower crane, crane, man goods elevator, lift, there are national standards
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:How many tons are tower cranes QTZ125?
1 tower crane QTZ125 has 8 tons, also has 10 tons.2, QTZ125 tower crane is Shandong fuiou Co., make full use of group technology, modular design and finite element analysis technology, the "computer design platform for tower crane tool designed for the newest type of hoisting and conveying machinery.The machine is a horizontal boom, trolley luffing and upper slewing hydraulic lifting crane.
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
315, 40 months rent about more than 10000, some have the strength to buy ah, rent two years is enough to buy one. Ha-ha

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range