Tower Crane Split in row of weight QTZ80(6010)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 QTZ80(6010) Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity:6T /8T

Rated Lifting Moment:80MT    Max. Lifting Load: 6T/8T

Max. Lifting Height: 182M           Span: 60M 

Model Number:   QTZ80(6010) 

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

 QTZ80(6010)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary,Travelling, external,internal climbing tower crane 

4. Impeller blasting,rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

 QTZ80(6010)  Specification

Tower Crane Split in row of weight  QTZ80(6010)

 QTZ125 Pictures




Tower Crane Split in row of weight  QTZ80(6010)

Tower Crane Split in row of weight  QTZ80(6010)

Tower Crane Split in row of weight  QTZ80(6010)

Tower Crane Split in row of weight  QTZ80(6010)

 QTZ80(6010)  FAQ

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:How many tons are tower cranes QTZ125?
1 tower crane QTZ125 has 8 tons, also has 10 tons.2, QTZ125 tower crane is Shandong fuiou Co., make full use of group technology, modular design and finite element analysis technology, the "computer design platform for tower crane tool designed for the newest type of hoisting and conveying machinery.The machine is a horizontal boom, trolley luffing and upper slewing hydraulic lifting crane.
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.
Q:What is the scrap standard of tower crane hook?
The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:Detailed parameters of QTZ80 tower crane 50
You made the tower crane. All manufacturers are not necessarily the same
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
This really did not hear, the site installed to be tested, usually installed, in accordance with the safety procedures, acceptance of the OK
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:Tower crane four limit, two insurance, two insurance what is that?
Refers to the air switch and the electric leakage protector in the electric tray.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range