• Tower Crane of Chang Li Model Number QTZ200(7020) System 1
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 2
  • Tower Crane of Chang Li Model Number QTZ200(7020) System 3
Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
200 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ200(7020)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 1-8t

Rated Lifting Moment: 60m

Max. Lifting Load: 8t

Max. Lifting Height: 201m

Place of Origin: Henan, China (Mainland)

Brand Name: YU JIE

Model Number: QTZ200(7020) 

Certification: CE & ISO

Warranty: 12 months, 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Jib Length (M): 60

Free Height (M): 46

Max. Possible Height (M): 201

Max. Load (T): 8

Tip Load (T): 1.0

Slewing Speed (r/min): 0-0.6

Counterweight (T): 15.8

QTZ200(7020)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

QTZ200(7020)  Specification

 Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  Pictures

 

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

Tower Crane of Chang Li Model Number QTZ200(7020)

QTZ200(7020)  FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What about our tower crane's warranty?

A: Usually there is oneyear quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

 

 


Q:?? Please star my ? i will give you points!
Although I haven't seen it done I imagine that especially for very high cranes it's done most often with cables and winches (utilizing a pivot point at the bottom of the structure). For many lower cranes such as those found on vehicles hydraulic lifting is sufficient.
Q:Firstly, I realize that the 1000 paper crane thing is based on faith and not science. I'm not stupid. Secondly, Do the 1000 cranes have to be in the same place? If I send one of my cranes to a friend across the country, would that no longer count as part of my 1000 cranes?If a crane gets destroyed, must I start over or replace that crane?If anyone has any knowledge or link pertaining to the 1000 paper crane myth, please post it. Thank you.
The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Q:Emergency treatment of interrupted electricity during lifting of tower crane
The rotating gear shall be immediately inserted into the screw or wood, while the power supply shall be checked rapidly to remove the trouble.
Q:You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
The first crane generally arrives on a trailer or on it's own wheels.
Q:a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
Q:need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
Hello, okorder /
Q:Im looking for more information on Overhead Cranes!?
Advantages of Overhead Crane for Professionals When large materials have to be handled in the building, construction and mining industries, there are several types of equipment that would be used. One of such equipment is the overhead crane, and because of its size, it is conspicuously seen at construction or mining sites. Not only does it have a domineering figure but it is also a very versatile equipment for moving heavy materials from one point to the other. This equipment occurs in many forms and the various forms it has, makes it adaptable to many environments. There are other types of equipment that are available for lifting, but a crane is the preferred choice of many people. I got most of this information from www.hoistandwinch .uk There are several reasons people in the construction and mining industries would choose a crane over other equipment that are used for lifting. With overhead cranes, there would be absolutely no need to clear aisles before materials can be moved. Forklifts or fork trucks could have their paths blocked and a lot of time and energy would have to be diverted to clear an aisle. Obstructions that could even make you suspend important projects are irrelevant to overhead cranes because they would easily make it around them without any form of difficulty. It is therefore possible to arrange your plant floor the way you would want it to be for your business, without thinking about obstructions to the lifting and movements of materials with cranes to do all the task for you.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords