• TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 1
  • TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 2
  • TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 3
  • TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 4
  • TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 5
  • TCD6037 12T 16T 18T Tower Crane Luffing Cranes System 6
TCD6037 12T 16T 18T Tower Crane Luffing Cranes

TCD6037 12T 16T 18T Tower Crane Luffing Cranes

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
18T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
18T
Span:
60M
Rated Load Moment:
300N.M

Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 18T

Place of Origin: China(Mainland)          Model Number: TCD6037

TCD6037 12T 16T 18T Tower Crane Luffing Cranes

TCD6037 12T 16T 18T Tower Crane Luffing Cranes

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 30-40days

 

TCD6037 12T 16T 18T Tower Crane Luffing Cranes

TCD6037 12T 16T 18T Tower Crane Luffing Cranes


Declaration of Tower Crane

1. Warranty period  shall be 12 months counting from the date of shipment

2. Spare parts within guarantee period against mechanical failure or faulty workmanship are under warranty.

3. Wearing parts are not under warranty. Replacement of wearing parts is provided.

4. The manufacturer disclaim all responsibilities for any damage or accident caused by failure use or maintenance.

5. Any damage caused by unqualified voltage and natural calamity is on the user’s risk. Paid service and replacement are provided.

6.Ambient temperature: -20℃—40℃, maximum working wind-speed, 20m/s

Q:how to do tower crane maintenance?
Tower okorder /
Q:Kindly name the companies.
which okorder / -indian Search engine-quite effective for local searches..
Q:It's a local company in Omaha that seriously could be the next Starbuck's if they ever expand.
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.
Q:why do siberian crane migrate in india?
Would you spend a winter in Siberia if you could fly south?
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
Lightning protection grounding is less than 10, transformer grounding is less than 4, special equipment requirements is less than 1
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q:i have an echo-1 m8a4 cqb it has a crane stock that fits a 9.6 1500mah battery but it wont fit a 2000mah so i want to switch to a full stock but im haveing trouble figuring out how to switch them. does anyone own this gun and know how to do it?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q:For anyone who has read/studied Stephen Crane - do you know of any connecting theme within his most famous short stories (the open boat, the blue hotel, the bride comes to yellow sky, the monster)?I was think naturalism b/c it is so prevalent in the open boat but is really the only short story naturalism is in
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:What are the three different types of Cranes?
Try okorder /
Q:Dear Friends, I wish to design a crane mounted industrial truck of overall weight 2 to 3 tons (including the load). I need a Diesel engine, wheel and brake system, drive system, steering system to desii#92;gn a truck. Please suggest me what all the available cheepest automobile spare parts will suitable for my design and whr can i get these parts easily
You probably meant a truck-mounted crane. There are industries offering ready-made solutions that work. Have you ever designed a truck or a crane before? It's a challenging engineering task and it can't be improvised. Besides, whatever you design and build will have to undergo extensive testing before being authorized to operate on public roads. The solution would cost more than anyone would care to pay for it. Consider buying a used rig instead.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords