Hydraulic Mobile Scaffolding Platform from CNBM !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Shandong, China (Mainland) | Brand Name: | JIURUI | Model Number: | SJY0.3-16 |
Load Capacit: | 300KG | Table Size: | 3150*1800 | lifting height: | 16m |
working height: | 17.7m | Overall Dimensions3: | 3700*2300*2950 | (Optional)Voltage: | 380 / 220/ 110 /415 v |
Power: | 2.2 kw | Net.weight: | 3900KG | product name: | hydraulic platform of scaffolding |
OEM: | yes |
Packaging & Delivery
Packaging Details: | plywood for outside and plastic film for inside |
Delivery Detail: | 15working days after get the rest payments |
Product Description
hydraulic platform of scaffolding for repairing in aerial work
Main feature
1) lifting is stable
2) convenient operation
3) safety and creditbility
4)CE certificated
Parameter:
1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m
2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs
Safety:
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs
2. the limit switch system helps the lift to stop at accurate position.
3. all the work platforms are passed 1.2 times loading test before leaving factory.
4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.
Application:
1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.
2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.
3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon.
Product List:
Model | Capacity | Table size | Max height | Work height | Total dimension | Net weight |
SJY0.3-4 | 300Kgs | 1500×750mm | 4m | 5.7m | 1850×900×1900mm | 400Kgs |
SJY0.3-6 | 300Kgs | 1500×750mm | 6m | 7.7m | 1850×900×1970mm | 650Kgs |
SJY0.3-8 | 300Kgs | 1650×1000mm | 8m | 9.7m | 2100×1200×2460mm | 1200Kgs |
SJY0.5-8 | 500Kgs | 1980×1220mm | 8m | 9.7m | 2500×1550×2380mm | 1400Kgs |
SJY0.8-8 | 800Kgs | 2000×1220mm | 8m | 9.7m | 2600×1550×2640mm | 1700Kgs |
SJY0.3-10 | 300Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1500Kgs |
SJY0.5-10 | 500Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1600Kgs |
SJY1.0-10 | 1000Kgs | 2220×l220mm | 10m | 11.7m | 2820×1720×2850mm | 2380Kgs |
SIY0.3-12 | 300Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2580Kgs |
SIY0.5-12 | 500Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2780Kgs |
SJY1.0-12 | 1000Kgs | 2600×1500mm | 12m | 13.7m | 3200×2015×3090mm | 3580Kgs |
SJY0.3-14 | 300Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3000Kgs |
SJY0.5-14 | 500Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3200Kgs |
SJY0.3-16 | 300Kgs | 3230×l600mm | 16m | 17.7m | 3700×2000×3030mm | 3900Kgs |
SJY0.3-18 | 300Kgs | 3230×l600mm | 18m | 19.7m | 3700×2000×3250mm | 4500Kgs |
SJY0.3-20 | 300Kgs | 3230×1600mm | 20m | 21.7m | 3700×2000×3450mm | 5100Kgs |
We are different,because…
we offer a ‘one-stop-shop’ for all your EWP needs
we can supply a comprehensive range of access equipment for any business or budget
we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine
we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island
our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time
we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms
we keep a full service history on your machine free of charge
we provide loan machines during rebuilds and extended repair jobs to minimise downtime
we offer a full-service workshop in Christchurch and service the whole country
we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)
all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).
- Q:The permanent magnet (permanent magnet sucker) the principle of who knows?
- Permanent magnetic chuck is designed by using the principle of superposition flux continuity principle and magnetic field of the permanent magnetic circuit design, magnetic chuck into a magnetic system, the relative motion of the magnetic system, realize the magnetic pole on magnetic field strength additive or cancellation, so as to achieve the purpose of holding and unloading.
- Q:What is the working principle of a screw jack? What's the difference between an ordinary hydraulic jack and an ordinary hydraulic jack?
- The screw jack is a pure machine, and the two jacks are fundamentally different in principle. Open the relief valve. Press the small piston constantly, and the big piston can shrink back under the action of gravity
- Q:Rack type lifting machine, rack press, rack lifting machine
- Rack type lifting machine is mainly used for railway track laying and maintenance. The utility model is widely used for lifting and supporting the installation of various heavy objects and equipment in industrial and mining enterprises, as well as bridge erection.
- Q:The principle of an air compressor for connecting two pistons
- In order to improve efficiency and reduce air temperature, intermediate cooling is needed. As the piston type air compressor air compressed by two stage low pressure cylinder pressure from p 1 to p 2, T l to T temperature by 2; and then flows into the middle cooler, at constant pressure of cooling water heat, the temperature is T L; the high pressure cylinder compression pressure to 3 P. As can be seen from the diagram, the air temperature T, l and T 2 entering the low pressure cylinder and the high pressure cylinder are located on the same isotherm 12 '3', and the two compression processes deviate from the isotherms. The same compression ratio p 3 / P 1 single stage compression process is 123 ", which is much higher than the two stage compression deviation from isothermal 12 '3', that is, the temperature is much higher. And the single stage compression work is equivalent to the area of 613 "46", and the two stage compression work is equivalent to the sum of 61256 and 52 '345 in the figure, and the work saved is equivalent to 2' 23 '32'. It can be seen that the staged compression can reduce the exhaust temperature, save compression work and improve efficiency.
- Q:What's the difference between a horizontal jack and a vertical jack?
- Vertical jack: using hydraulic principle, different from the traditional mechanical jack, it has the advantages of easy operation, safety, reliability, labor saving, mobility and so on.
- Q:What are the protective measures against crane injuries?
- Crane type selection is reasonable, the road is flat and solid, and should not work on the slope.
- Q:Please explain how to prevent the safety accidents in the process of tower crane installation and disassembly
- Tower crane disassembly method and installation method is the same, the program is just the opposite. When folded, the building has been built, and the site is not so spacious as to be installed. Therefore, we should never take it lightly.1, tower crane demolition of the basic requirements and installation of the same.2, the process of disassembly is strictly prohibited to use cutting scarify.3, remove the bolts, pins, and spare parts should be packing plate joint custody.4 、 the operation room is closed with iron sheet.5, the rotating machinery for maintenance, oil, sealed.6, the appearance of paint anti-corrosion.7, after the removal of tower cranes, conditional storage of the storage of some parts, unconditional storage part of the transfer to the vicinity of the special line stacking, ready for shipment.
- Q:What are the heavy lifting units commonly used in hoisting operations?
- Wire rope rope card is mainly used for wire rope and wire rope wear around the temporary connection block when the hand rope is fixed, and the cable wind rope head pole is fixed on the other.It is a widely used wire rope fixture in lifting operations. Commonly used wire rope clips, there are 3 kinds of riding, fist grip and press plate type. Among them, the riding card is the most powerful connecting standard, and the wire rope clip is the most widely used.
- Q:What important attention should be paid to large equipment?
- 1, the operation is not allowed to pull the operation power cord.2 work personnel should be familiar with lifting scheme and safety measures.3. Lifting tools and tools should be regularly maintained and tested.4, must by the corresponding qualifications professional card holder carries on.
- Q:Do you know the manufacturer of small lifting equipment?
- Direct import of power products mainly include: cutting machine series, punching machine series, cable processing, exhibition tools series, line construction tools series, etc..I have a large number of famous products, mainly related to import countries and regions: the United States, Japan, Germany, France, Holland, Sweden, Taiwan, Hongkong and so on.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hydraulic Mobile Scaffolding Platform from CNBM !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords