• Flat Top Tower Crane TC 5516 for Construction System 1
  • Flat Top Tower Crane TC 5516 for Construction System 2
  • Flat Top Tower Crane TC 5516 for Construction System 3
Flat Top Tower Crane TC 5516 for Construction

Flat Top Tower Crane TC 5516 for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Max. lifting capacity

t

6

Working range

m

3-56

Lifting Height

Independent

40.2

Adhered

151.2

Lifting speed

Double magnification

m/min

80/40

Quadruple magnification

38/19

Slewing speed

r/min

0.637

Trolleying speed

m/min

44/22

Climbing speed

0.4

Min. stable descending speed

<7< span="">

Overall dimensions

Foundation frame

m

8×8

Overall height

Independent

50.892

Adhered

160.892

Jib end to the swiveling center

56.17

Balance tip to swiveling center

12.39

Total weight

Structure weight

Independent

t

40.49

Adhered

80.87

counterweight

18.34

Total motor capacity

kW

41.52

Allowed operating temperature

C

-20-+40

Power supply parameters

50Hz

-380V±10%

 

 Flat Top Tower Crane TC 5516 for ConstructionFlat Top Tower Crane TC 5516 for Construction

 

Q:Kindly name the companies.
Chowgule from Goa,JCB ,Ballabgarh are the few companies. Refer Indiatrade directory for more info
Q:was he a realist or naturalist
Stephen Crane was a naturalist a lot like Jack London. His main themes were man vs. nature and man vs. himself in which nature is an abstract, omnipotent force that does not (and really cannot) care what becomes of the individual. In Crane's writings, man is often faced with strengths and weaknesses within himself when confronted by extremes of uncaring Nature (see the short story The Open Boat).
Q:Does anyone know where I can locate a print or lithograph of the chromolithograph done in the 1850's of William John WIlgus' Ichabod Crane and the Headless Horseman?
Ichabod Crane, Respectfully Dedicated to Washington Irving. by William J. Wilgus, artist chromolithograph, c.
Q:the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
So I can't tell whether the cargo container is one ton (2000 lbs.) or ten tons (20,000 lbs.). For doing the problem, I'm using 2000 lbs., so you might have to multiply the answers by 10. Also, I'll use A and B for the cranes instead of I and II. (Vertical): A sin 30° + B sin 45° = 2000 == A + √2 B = 4000 (Horizontal): -A cos 30° + B cos 45° = 0 == -√3 A + √2 B = 0 Solve those equations simultaneously to get A = 4000/(1+√3) = 1464 lbs. and B = √(3/2) A = 1793 lbs. (Answers) The vectors are: A = 1464 (-i cos 30° + j sin 30° = -1268i + 732j (Answer) B = 1793 (i cos 45°i + j sin 45°) = 1268i + 1268j (Answer)
Q:What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well, weak- anthropic beats the hell out of strong- anthropic. One cannot, in good conscience, postulate God from the improbability of a good primordial soup kitchen, when beating the odds is the prerequisite for anything evolving sufficiently to be amazed. Life, however, plays hell with probability, because it’s possible for an improbably complex thing to create as many improbably complex things as energy allows. Introduce evolution, crank out a tool user, it gets worse. One dedicated farmer can create a vast and profoundly improbable flourishing of life. Now if we move out into the universe and find a vast and improbable flourishing, we will have cause to suspect the existence of cosmic farmers. This especially because it appears we are evolving towards that state ourselves. Dressing up this concept in pseudo science though, strikes me as a bit pretentious. Which is my take on Louis Crane's idea of meduso-anthropic principle
Q:I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .
Q:across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
no but i wouldnt mind seeing one :P
Q:How many meters does the tower crane installation height require expert proof?
The mounting height of the tower crane is determined by the manufacturer's manual,It has nothing to do with experts,After the tower crane is installed, it needs to go through the provincial construction quality and safety supervision station, and the designated testing institution will meet the technical requirements of the production plant, and the method can be used only after the use of the permit.
Q:how do cranes get assembled ? on building sites?
By people.
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords