FANGYUAN TOWER CRANE TC4208

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:HELP me CRANE FLYS ARE IN MY HOUSE 5 AT LEAST!?
The spiders in your house will kill them and eat them. If you don't have spiders, just wait. They will come in for your crane flies. If you must get rid of them before the spiders do the work, use your vacuum. The crevice tool will suck them up and crush them in the bag. I had one in my house this morning. It was hanging around my east window as the sun was coming up. I used a towel to guide it toward the open patio door. You do need to be up about dawn for this to work.
Q:crane operator?
Ya dude--truck driver---your turn
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q:How to build a electromagnetic crane?
The bible does mention the pyramids. It is in Exodus when the Jews have been in captivity in Egypt and developed them. What? You suggestion the Egyptians had the skill or science to do it? The secret is that they were built from the highest down as a substitute than the bottom up.
Q:why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
Q:Origami Crane?
These okorder.com It takes quite a few tries to get it right, but once you do it is easy.
Q:methodology to value used crawler crane?
Supply vs demand Extreme examples: If the crane is no longer needed anywhere, the cost will be 0; no demand. If the crane still has a unique useable function and there is only one available, it's immediate cost will be very high; no supply. So, assuming that the cranes supply/demand is somewhere in the middle, the methodology for assessing it's cost would be to evaluate the following: * Where is it located with respect to where it is needed? (place value) * How quickly do I need it, and how quickly can I get the crane? (time value) * What alternative solutions are available? * How much do other similar cranes cost? * etc Hope this helps!
Q:1,000 Cranes equals a wish, right?
1000 Cranes Wish
Q:crane signals?
There are hand signals which are used by men not operating a larger crane for hoisting,lowering,stopping, holding and slow. There are more but you would get a better idea in the link below. Scroll to pictures. 2nd link is a place to purchase placards or magnetic backed visuals.
Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
the requirement for selecting the steel quality group based on the results of brittle fracture evaluation of steel is increased;Environmental requirements and nondestructive testing requirements for welds are increased;- increased the number of institutional requirements;- increased the type and requirements of some of the units;- - increased technical data requirements that manufacturers should provide;- added some information labeling requirements;- mounting and climbing requirements are increased;The inspection requirements of tower crane are described in detail.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range