Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CE-SC200/200 Description

Feature: Tower Crane                   Condition: New 

Application: urban construction      Rated Loading Capacity: 4T 

Rated Lifting Moment: 100MT        Max. Lifting Load: 4T 

Max. Lifting Height: 150M               Hoisting Speed: 34.4m/min

Model Number:  CE-SC200/200

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

CE-SC200/200 Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

CE-SC200/200  Specification

Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200

CE-SC200/200  Pictures 

 

Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200

Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200

Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200



Building Construction Elevator Easy Operated High Quality Passenger Hoist CE-SC200/200


CE-SC200/200  FAQ

 My dear friends, If you need any building construction elevator, please tell us the below basic parameters:

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements 

Welcome to contact us! Believe will be your best choice!


 

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:Detailed parameters of QTZ80 tower crane 50
The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
more than 1250KN.m (including 1250KN.m), the factory more than 20 years of age (including 20 years);Construction hoist: SC years of construction for more than 8 years (excluding 8 years) SS construction hoist; factory life of more than 5 years (excluding 5 years) of the construction hoist.Excluding other areas
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:Brief introduction of ten no hanging criterion for tower crane operation
4, buried objects do not pull the crane; 5, cable-stayed holding objects not hanging 6, the slings and objects; rickety bundle does not meet the safety requirements to crane; 7, vehicle weight hanging directly processed when not hanging;
Q:Who invented the tower crane, please?
Tower crane originated in Western europe. The first patent on tower cranes for construction was issued in 1900. In 1905, a crane with a boom was fixed in the tower. In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:What courses should I take to buy the tower crane to be installed?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range