• Tower Crane CMAX TC6016 Construction Machiney System 1
  • Tower Crane CMAX TC6016 Construction Machiney System 2
  • Tower Crane CMAX TC6016 Construction Machiney System 3
Tower Crane CMAX TC6016 Construction Machiney

Tower Crane CMAX TC6016 Construction Machiney

Ref Price:
$113,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:
Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift

and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.


Features:
1. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
2. This Tower Crane equipped with hydraulic lifting and connecting. This Tower Crane' s height can accordign to the actual height of the building and at the same time without changing the lifting capacity.
3. LVF: Frequency control, variable speed, smoothness and high stability, non-striking.
4. Moment motor, high stability, long working life.
5. SM: Three-speed change pole motor, simple in structure, economical ,fitting.
6. has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
7. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.


Specifications:

Tower Crane CMAX TC6016 Construction Machiney

Tower Crane CMAX TC6016 Construction Machiney

 

Q:How do they get the cranes and counterweights down off the top of buildings when finished?
Dereks, which are built along side of the buildings, actually take themselves apart. There is a jacking system which attaches to the segment that is 2nd from the top. This lifts the bussiness end of the crane off the top segment which can then be unfastened and lowered to the ground. The jacking system then replaces the crane on the new top, travels down one more segement and the process is repeated. It is actually cool to watch.
Q:What do you think of this?A teenage boy giving a girl 1000 paper cranes to show his love for her, despite the fact that she previously said she just wanted to be friends. They are 14. He just wants to prove it to her that he is unlike any other boy.
paper cranes take me about 3 minutes to make, that means he took 50 hours making them, wich means he spent 2 whole days folding non-stop... that isn't enough to make a lasting impression, even for a 14yr. old.
Q:What does "jack up" tower crane 1000KNm mean?
1000KNm means that the rated lifting moment of the tower crane is 1000KNm. That is to say, the 100tm tower crane.
Q:What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q:I would like to get some advice from Martial artists of the training that Crane style Kung Fu go trough especially the balance. I would like to learn how they learn to balance without difficulty and the training they go trough.
Balance is balance - there's no specific training but good balance will help you with all aspects of your training. A few things that helped me - tying shoelaces by getting into a crane posture rather than kneeling to the laces. The concentration on the shoe helps to balance you. Practice Crane Stance and try to keep a clear mind while in the stance - if you start worrying then you'll fall. Remember to keep the knee high and the foot pointed.
Q:I don't understand why or how they still exist. I know I'll get some answers saying they're part of the food chain but what animal on earth would get a sufficient meal from one of these?
What is the point of humans for that matter... And yes I am going to give you a food chain answer. You see, crane flies start off in the water as a larva. The larva is fat and plump and fairly large compared to the adult crane fly. While in larva state the crane fly larva is a sufficient food source for many aquatic creatures such as crayfish and other nymphs such as dragonfly nymphs. While in adult form the crane fly is consumed by many birds, while it may not be a sufficient meal itself, it is one less insect that the bird consume to be satisfied.
Q:what is the proper way to fold a paper crane?
I would go to a library or a book store and find a book on origami.
Q:I have preliminary data: up to 2 tons of weight; work range of 40 meters; lifting torque 800KNm; lifting height 45m.. I encountered problems in the design, and some of its specific reference, I would like to ask here, for example, how much is the weight of its whole machine, how much is the balance weight, the balance of the radius of gyration? Super boom weight? (it's better to have the approximate weight of each component). And when I design this tower crane, is it necessary to use planetary gear for the gear reducer?Thanks to your advice, Liu is here to thank you
You're welcomeDesign units are different.Our factory is Langfang Design Institute drawings. May refer to the following.Arms 55 meters long.
Q:Cranes are normally used in construction in most countries.But I saw some photos that show Iranians are hanging criminals in pubic with cranes instead of gallows.Is it more painful to the dying criminals to the last moment?Do you know why?
they probably didn't have the proper arrangements to carry out the punishment so they used cranes instead of gallows. who knows? but weird really. and it wouldn't be more painful... err... the purpose is to snap the neck... ouch :(
Q:I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
but never have I seen a set of tracks or elevator used...not to say that it isn't possible but I have only worked big buildings in NYC...maybe things are done differently elsewhere in the world

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords