• tunnel lining trolley System 1
  • tunnel lining trolley System 2
  • tunnel lining trolley System 3
  • tunnel lining trolley System 4
  • tunnel lining trolley System 5
tunnel lining trolley

tunnel lining trolley

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The tunnel liningtrolley is the large steel structure template system which is supported bymodular steel door frame, the motor drives the running gear to orient thetrolley walking. It uses hydraulic cylinder and jackscrew to adjust thetemplate position and the stripping tunnel concrete forming equipment.

Our tunnel liningtrolley has the following advantages: reliable structure, easy to operate, fastlining, low cost, good forming of concrete. It can accelerate the constructionspeed effectively, reducing the interference to other construction work insidethe cave. It already reaches the international advanced level with goodeconomic and social benefits. Therefore, it is widely used in the tunnelconstruction of road, rail, water and electricity, urban subway.

The DanjingMountain crosses through the Longquan Mountain tunnel and arrives at theShuangliu territory, built especially for the “Two lakes, one mountain”International Leisure Tourist Area, and is the important control project ofSancha Lake fast tourist track. The total investment of project budget is of230 million yuan, the length is of 2405.5m, tunneling from both sides ofShuangliu and Jianyang oppositely. Started on December 18, 2008 and finishedsuccessfully on the morning of October 12, 2009. China Railway 18th BureauGroup undertook the tunnel construction tasks and the difficulty lies in the smallinclination strata dome's collapse problem.

The DanjingMountain crosses through the Longquan Mountain tunnel and arrives at theShuangliu territory, built especially for the “Two lakes, one mountain”International Leisure Tourist Area, and is the important control project ofSancha Lake fast tourist track. The total investment of project budget is of230 million yuan, the length is of 2405.5m, tunneling from both sides ofShuangliu and Jianyang oppositely. Started on December 18, 2008 and finishedsuccessfully on the morning of October 12, 2009. China Railway 18th BureauGroup undertook the tunnel construction tasks and the difficulty lies in the smallinclination strata dome's collapse problem.

YunZhong Mountain Tunnel is the control project of tender #A1 of Shuang-YongHighway, undertaken by China Railway Bureau 22 Group The Third Company. YunZhong Mountain Tunnel is the two-hole separation tunnel, the length of which is5.57km, it is the longest tunnel project of Xin-Bao Expressway. This liningtrolley is easy to operate, it walks automatically, the structure is advancedand is well-made, and the weight is of 120 tons. It has the followingcharacteristics: establishing and stripping mold by hydraulic completely, thedegree of lining surface’s finish is high, and the lining speed is high. Thislining trolley can line mold with the length of 12.1m.

Theinspection team is made of Shuang-Yong project department, Traffic SupervisionCompany of Fujian Province and Shuang-Yong Expressway Industry Office. Theycarefully checked and measured according to the drawings, inspecting well thekey parts such as trolley’s centerline, flatness of template, templateinterface connections, opening and closing of curved template, hydraulicsystem, etc. After the acceptance, they thought that the trolley’s structure,material, installation quality and small parts had been handled well. Becauseof the qualified acceptance, they agreed to put this into use.

Jin Gua MountainTunnel is the important control project of Xiang-Pu Railway, the length of thetunnel is of 14.097km, the left pitch of tunnel is of 30m, establishing oneparallel guide pit. The Jin Gua Mountain Tunnel sits in the southern section ofDai Yun Moutain with lots of forests and cliffs, and the terrain is extremelyadvantageous. China Railway Bureau 1, the fourth company of which undertook theconstruction task of 6926m from the positive exit cave, 7167m of parallel guidepit on the left side. The characteristics of this tunnel: tight schedule-had totunnel more than 200m for the positive cave per month, and 240m for theparallel guide pit; the geological and hydrological conditions are poor; theconstruction standards are high.


Q: For example, what programming language and/or software would be used to control an automated sprinkler system, or other automated device? I want to know how the software interacts with the machine.
Usually industrial computers us logic programming. A PLC, ie, Progrmmable Logic Controller, is used in many automation uses. They use logic to make decisions.
Q: On December 31, 2012, Flint Corporation sold for $100,000 an old machine having an originalcost of $180,000 and a book value of $80,000. The terms of the sale were as follows:$20,000 down payment$40,000 payable on December 31 each of the next two yearsThe agreement of sale made no mention of interest; however, 9% would be a fair rate for thistype of transaction. (The present value of an ordinary annuity of 1 at 9% for 2 years is 1.75911.)Prepare the journal entry to record the sale of the machine.
40,000 x 1.75911 = $70,364 PV of note receivable Dr Cash 20,000 Dr Notes Receivable 70,364 Dr Accumulated Depreciation--Machine 100,000 Cr Machine 180,000 Cr Gain on Disposal 10,364
Q: he is married to a cuban
i think i saw him stealing a car down my road last night
Q: what technology/machinery is used to sort recycling?
Modern Technology and various machinery is used, Magnets for metals, Humans, Air, Cameras, you name it its used.
Q: My boyfriend is looking into becoming a heavy equipment operator, ive been looking for informations but i cant quite find any!I wanted to know things like is it in high demand and if he would make ok money? We live in Canada but if you live in the states ide still love to hear from you! So here are a few of my questions:-Do they make good money?-Do you have to move alot?-Is it a steady job, like an everyday thing?-Is it easy to move up in a company? (and possibly make more money?)Dont think im in this just for the money because im not :P i just think its important to make sure that you can support a family before you actually get into doing a job!Thanks a lot guys!!
what exactly will he want to do? technician or operator? what type of machine ? these fields aren't going anywhere and most of them are steady. pay can range from $30K - $40K depending where you live and your training level. as for moving up in the company.... no idea. it all depends if the company trains you or sends you out for more training. then yes, they will want to keep you longer if they are investing money in you and will give you raises to keep you happy.
Q: Big mechanical engineering machinery, or other, the bigger the better
There are TC2000300 tons of car out of West Germany (flower, crane boom and counterweight need another crane assembled). Steel structure workshop general domestic hoisting crane most commonly used, but must calculate the crane position and radius of gyration. There are 200 tons of motor cranes in Japan in recent years, telescopic rod, fully self-propelled.
Q: Mechanical keyboard?. How much is good?
Razer's widow only green axis, and the key conflict is relatively weak, then the characteristics of Razer products are relatively easy to bad advice; in addition, Razer is also the widow cherry (Ying Tao) MX shaft, and other mechanical and not much different, except for the spring reduces the effective pressure. ~ ~ ~ and than the original quality to the problem of the poor, is the same as the original picture of the man ~ ~ ~ ~ so it is not easy, but no brain SS powder
Q: What does to dowel an equipment mean? (referred to rotation machinery)?
Dowels are meant to locate, fasteners only fasten.
Q: I have made my own clock system and it would only work if the clock goes round once in 86400 seconds - in one day instead of twice. So what do I have to do with my clock to make that work? btw. I'm not talking about a digital clock-
Check the back of it to see if there is a 12 hour setting and 24 hour setting. You might be able to just flip a switch.
Q: Mine is a 1962 Massey Ferguson farm tractor.
A hammer.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords