• tunnel lining trolley System 1
  • tunnel lining trolley System 2
  • tunnel lining trolley System 3
  • tunnel lining trolley System 4
  • tunnel lining trolley System 5
tunnel lining trolley

tunnel lining trolley

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The tunnel liningtrolley is the large steel structure template system which is supported bymodular steel door frame, the motor drives the running gear to orient thetrolley walking. It uses hydraulic cylinder and jackscrew to adjust thetemplate position and the stripping tunnel concrete forming equipment.

Our tunnel liningtrolley has the following advantages: reliable structure, easy to operate, fastlining, low cost, good forming of concrete. It can accelerate the constructionspeed effectively, reducing the interference to other construction work insidethe cave. It already reaches the international advanced level with goodeconomic and social benefits. Therefore, it is widely used in the tunnelconstruction of road, rail, water and electricity, urban subway.

The DanjingMountain crosses through the Longquan Mountain tunnel and arrives at theShuangliu territory, built especially for the “Two lakes, one mountain”International Leisure Tourist Area, and is the important control project ofSancha Lake fast tourist track. The total investment of project budget is of230 million yuan, the length is of 2405.5m, tunneling from both sides ofShuangliu and Jianyang oppositely. Started on December 18, 2008 and finishedsuccessfully on the morning of October 12, 2009. China Railway 18th BureauGroup undertook the tunnel construction tasks and the difficulty lies in the smallinclination strata dome's collapse problem.

The DanjingMountain crosses through the Longquan Mountain tunnel and arrives at theShuangliu territory, built especially for the “Two lakes, one mountain”International Leisure Tourist Area, and is the important control project ofSancha Lake fast tourist track. The total investment of project budget is of230 million yuan, the length is of 2405.5m, tunneling from both sides ofShuangliu and Jianyang oppositely. Started on December 18, 2008 and finishedsuccessfully on the morning of October 12, 2009. China Railway 18th BureauGroup undertook the tunnel construction tasks and the difficulty lies in the smallinclination strata dome's collapse problem.

YunZhong Mountain Tunnel is the control project of tender #A1 of Shuang-YongHighway, undertaken by China Railway Bureau 22 Group The Third Company. YunZhong Mountain Tunnel is the two-hole separation tunnel, the length of which is5.57km, it is the longest tunnel project of Xin-Bao Expressway. This liningtrolley is easy to operate, it walks automatically, the structure is advancedand is well-made, and the weight is of 120 tons. It has the followingcharacteristics: establishing and stripping mold by hydraulic completely, thedegree of lining surface’s finish is high, and the lining speed is high. Thislining trolley can line mold with the length of 12.1m.

Theinspection team is made of Shuang-Yong project department, Traffic SupervisionCompany of Fujian Province and Shuang-Yong Expressway Industry Office. Theycarefully checked and measured according to the drawings, inspecting well thekey parts such as trolley’s centerline, flatness of template, templateinterface connections, opening and closing of curved template, hydraulicsystem, etc. After the acceptance, they thought that the trolley’s structure,material, installation quality and small parts had been handled well. Becauseof the qualified acceptance, they agreed to put this into use.

Jin Gua MountainTunnel is the important control project of Xiang-Pu Railway, the length of thetunnel is of 14.097km, the left pitch of tunnel is of 30m, establishing oneparallel guide pit. The Jin Gua Mountain Tunnel sits in the southern section ofDai Yun Moutain with lots of forests and cliffs, and the terrain is extremelyadvantageous. China Railway Bureau 1, the fourth company of which undertook theconstruction task of 6926m from the positive exit cave, 7167m of parallel guidepit on the left side. The characteristics of this tunnel: tight schedule-had totunnel more than 200m for the positive cave per month, and 240m for theparallel guide pit; the geological and hydrological conditions are poor; theconstruction standards are high.


Q:Why do mechanical systems usually use nitrogen gas tanks instead of other gases in mechanical engineering?
The nitrogen inert gas has the advantages of stable and non burning, high purity nitrogen extraction, low cost and good compressibility of nitrogen,
Q:In Biology my class is studying Respiration and Photosynthesis in depth (dark and light reactions; electron transport, glycosis, and krebs cycle) and we have an independant project. My problems is I'm not sure what cellur machinery is (he said those is what he calls them). Does it refer to organelles even smaller than mitochondria and the other cell parts (do they even exist)? I'd just like a link or a phrase to google so I know what I should be looking for.
-ose is an ending that indicates a carbohydrate, such as glucose or lactose. How this could indicate cellular machinery is a mystery. About the closest process requiring energy I can think of is cyclosis or endocytosis; both require ATP...
Q:This is a sentence from a novel which I do not understand its meaning. What is a whirling machine? and does it relate to scratching eyebrow? Or it is just an idiom? The setting of the story is around 1940.
The teacher(?) is implying that the children are stupid. That a machine (the brain) has to labour just to tell them to scratch their eyebrows!
Q:Please read this article and tell me
God made it all, and all of the scientist in the world can't change that.
Q:I am related to building and construction business. I want to buy new and second hand building and construction machinery like cairns and excavators. Can you tell me any good web site where I can check the prices and specifications of these machineries and buy them?
not known.
Q:If not then what is the sense of me taking it essay?
You can operate heavy machinery with viagra as long as you wear a hard hat.
Q:Holy Cow! What happens if the Holy Spirit comes over you while driving or operating heavy machinery?
sounds like an impending worker's comp claim.
Q:can we fly by using some anti-gravity shoes or opposite of gravity (negative gravity).
In theory maybe, there have been scientific paper's written about anti-gravity that explain how it could be done but any attempt to do it hasn't shown much results yet.
Q:Mechanical keyboard?. How much is good?
SteelSeries 7G was the best, it is good to the keyboard, but this product is worth the price, if the lower 300~400 (original price of around 1000, but in fact most of the more than and 800 machines are better) is recommended; also have to mention the domineering hands support, is comfortable, only 90% people in use after a period of time will get rid of it, because too big and too much in the way of the place
Q:In advance for the next year, our accountant should record the receipts as a debit to cash and should make a credit to Revenue account (such a Lease revenue) or A differed credit account (such as differed lease income)
Since you're being paid in advance, before you have actually earned the revenue, the credit will be to a deferred revenue account. That account shows up as a current liability on the balance sheet. It is a liability, because you still owe the use of the machinery for the next year to the customer. And, if something were to happen where you could not deliver the machinery to the customer, for example, if it broke down and could not be repaired or replaced, you would owe the customer his money back.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords