• Tower Crane of Chang Li Model Number DTZ125(4830) System 1
  • Tower Crane of Chang Li Model Number DTZ125(4830) System 2
  • Tower Crane of Chang Li Model Number DTZ125(4830) System 3
  • Tower Crane of Chang Li Model Number DTZ125(4830) System 4
Tower Crane of Chang Li Model Number DTZ125(4830)

Tower Crane of Chang Li Model Number DTZ125(4830)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

DTZ125(4830)  Description

Feature: Tower Crane

Condition: New

Application: all kinds of construction

Rated Loading Capacity: 5T,6T,8T,10T,12T

Rated Lifting Moment:500KN.m/630KN.m/800KN.m/1000KN.m/1200KN.m

Max. Lifting Load: 5T,6T,8T,10T,12T

Max. Lifting Height:120m/120m/150m/150m/150m

Span: 120m/120m/150m/150m/150m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: DTZ125(4830)

Certification: CE,ISO,BV,SGS

Warranty: ONE YEAR

After-sales Service Provided: Engineers available to service machinery overseas

color: according to the customer's requements

DTZ125(4830)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Advanced painting process

4. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

5. New designed mast, can be used to Internal and external climbing tower crane

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

DTZ125(4830)  Specification

 Tower Crane of Chang Li Model Number DTZ125(4830)

DTZ125(4830) Pictures

Tower Crane of Chang Li Model Number DTZ125(4830)

Tower Crane of Chang Li Model Number DTZ125(4830)

Tower Crane of Chang Li Model Number DTZ125(4830)

QTZ100A(5515)  FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.

 

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;



 

 


Q:I know they will leave because last year they left after a few weeks. I have seen that they normally leave after a month. They annoy me and I want them gone. They have been around since the end of February or beginning of March. Does anyone else have these in their house. It seems like they are leaving slowly usually there is like 1 or 2 a day in moms room but the last 2 days there have not been any. They have been in my room, just one a day it seems like and maybe one in the kitchen. We swat them or spray them and they die eventually but when will they be gone atleast for a little while?
Crane flies are totaly harmless to humans.They fly for some time and fall down to earth.Ants will take them away.These flies never byte or sting. Pet Cats like to play with it and catch it.They will disappear after some time. Do you know that crane flies spend most of their lives underground in their larval forms, which are known as leatherjackest?. Leatherjackets were very common round here, and are a favourite food of the local crows .These leatherjackets transform into crane flies.Summer is their growth time.
Q:Do you find it ironic a crane crashed into Mecca's holiest mosque on 9/11?
yhes
Q:How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.
Q:i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
Q:single shard pls need awnser quick 8th grade lit test
wise, caring, lighthearted courageous survivor Assuming you've read the book , you'll need to find examples to prove these characteristics.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:How to build a tower crane?
Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.
Q:What are the characteristics of a tower crane?
Four, according to the different installation methods of cranes, can be divided into folding transport, self erection of the rapid erection of tower cranes and the need to use the auxiliary machine assembly and disassembly of tower cranes.Can set up their own fast loading crane are small and medium slewing tower crane, mainly used for short duration, low buildings move frequently, the main advantage is to improve work efficiency, save installation cost, save time and labor and material, disadvantage is the complicated structure, large amount of maintenance.A tower crane that needs to be disassembled and assembled by an auxiliary machine is mainly used in middle and high rise buildings, with large working range and large lifting capacity. It is the main type of construction site at present.Five, according to whether the spire structure, can be divided into flat head tower crane and tower tower crane.Tower crane is a new type of tower crane is developed in recent years, its characteristic is the tower cap and the rod part before and after the cancellation in the structure of the original tower crane on the enhanced structural strength of the arm and balance arm, arm and balance arm is directly connected, the utility model has the advantages of:1 、 the whole machine is small in size, easy to install and safe, reduce transportation and storage costs;2, the boom of tolerance and good performance, uniform stress, small damage on the structure and connection part;3, component design can be standardized, modular and interchangeable, reduce equipment idle, improve investment efficiency.It is in the same type of tower crane tower crane head Zhongping slightly higher prices.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords