• Timer Beam Formwork Systems for Concrete Construction System 1
  • Timer Beam Formwork Systems for Concrete Construction System 2
Timer Beam Formwork Systems for Concrete Construction

Timer Beam Formwork Systems for Concrete Construction

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Timber Beam Wall Formwork Description 

The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

 

2. Main Features of Timber beam wall formworks

-convenient for construction 

-easy to control the quality

-easy, rapid and economical.


3. Timber beam wall formwork Images

Timer Beam Formwork Systems for Concrete Construction

Timer Beam Formwork Systems for Concrete Construction

 

 

4. Timber Beam Wall Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Wall Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks 


Q:What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q:China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q:What are the world famous mechanical equipment exhibition?
3, the French international civil engineering and Construction Machinery Exhibition (INTERMAT) the European Construction Committee (CECE), founded in 1988, tenth in 2015, is one of the three famous exhibition of world engineering machinery and construction machinery field, three years. France INTERMAT exhibition exhibits covering mining machinery, earthmoving machinery, concrete machinery, lifting machinery, pavement and compaction machinery, piling machinery, industrial vehicles, pneumatic tools, drilling machinery, building materials machinery, mining machinery and other engineering and construction machinery and spare parts industry. Paris International Construction Machinery Exhibition in Europe - the Middle East - Africa (EMEA) region has a unique position.
Q:What is the difference and connection between equipment manufacturing and machine building?
When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
Therefore, the medium carbon steel has the most extensive application in the medium strength level. Besides being used as building material, it is widely used in the manufacture of various mechanical parts. Welding: 1 the preheating is conducive to reducing carbon steel heat affected zone is the most
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Product quality certification, also known as product certification, internationally known as qualified certification. According to the 1991 implementation of the "people's Republic of China Quality Certification Management Regulations", the product quality certification is based on the product standard and relevant technical requirements, the certification institution confirmed by the certification and certification marks to prove that a particular product is in conformity with the relevant standards and technical requirements of the corresponding activities.
Q:What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ eliminate dangerous source: eliminate the risk source of the system can fundamentally prevent accidents. But an important point of system safety is that it is impossible to completely eliminate all sources of danger and that people can only selectively eliminate several specific sources of danger. Generally speaking, when the risk of a dangerous source is higher, we should first consider whether we can take measures to eliminate it. A dangerous source can be completely eliminated by selecting the proper production process, technology, equipment, reasonable design, structural form or suitable raw material. For example: instead of the power system with pneumatic or hydraulic system, to prevent the occurrence of electrical accidents; instead of compressed air system for hydraulic system, to avoid the pressure vessel, pipeline rupture caused by shock wave; with incombustible materials instead of combustible materials, to prevent the occurrence of fire. It should be noted that sometimes measures are taken to eliminate certain sources of danger, but new sources of danger may be brought about. For example, an electric pneumatic system instead of a power system can prevent electrical accidents, but a physical explosion accident may occur in the compressed air system.
Q:Changsha Sanlian Building Machinery Fittings Factory
In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
Q:How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q:What are the mechanical drawing software?
The 3D map only contact with SolidWords and Pro/E, Pro/E is better than Solidwords in general, but Solidwords is very simple to use, see Help tutorials you can learn to draw a three-dimensional map is not particularly complex easily to estimate a few days is enough. But any one of the two kinds of software, want to do not understand the words, expert advice is not really easy. UG and MasterCAM haven't touched much, but I've heard that it's suitable for processing stereogram.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords