Steel Ringlock Scaffolding Brace/ Bay Brace / Diagonal Brace CNBM
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Ringlock Scaffolding Bay Brace/Diagonal Brace
Name | Steel Ringlock Scaffolding Bay Brace / Diagonal Brace |
Place of Origin | China |
Brand name | CNBM |
Size | Ø48.3*3.25*1000/2000/3000 or as your request |
Main Material | Q345 ,Q235, Q195 |
Surface Treatment | High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized. |
Color | Silver, Orange |
Certificate | SGS, EN74, ISO |
Features | Automatic Welding |
Service | OEM Service available |
MOQ | 50ton |
Payment | T/T or L/C in sight |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
Futures:
Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
Low maintenance:The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.
The specification Ringlock Brace/Bay Brace/Diagonal Brace
Ring Lock System Scaffold Bay Brace / Diagonal Brace | |||
Model | Description | Weight(kg) | Weight(lbs) |
AR.DB.3050x2000 | Ring Lock Bay Brace 3050x2000mm (10') | 10.87 | 23.96 |
AR.DB.2745x2000 | Ring Lock Bay Brace 3050x2000mm (10') | 10.24 | 23.96 |
AR.DB.2440x2000 | Ring Lock Bay Brace 2440x2000mm (8') | 9.62 | 21.20 |
AR.DB.2130x2000 | Ring Lock Bay Brace 2130x2000mm (7') | 9.03 | 19.91 |
AR.DB.1830x2000 | Ring Lock Bay Brace 1830x2000mm (6') | 8.51 | 18.76 |
AR.DB.1520x2000 | Ring Lock Bay Brace 1520x2000mm (5') | 7.91 | 17.45 |
AR.DB.1220x2000 | Ring Lock Bay Brace 1220x2000mm (4') | 7.62 | 16.80 |
AR.DB.1150x2000 | Ring Lock Bay Brace 1150x2000mm (3'10") | 7.53 | 16.61 |
AR.DB.1065x2000 | Ring Lock Bay Brace 1065x2000mm (3'6") | 7.44 | 16.41 |
AR.DB.910x2000 | Ring Lock Bay Brace 910x2000mm (3') | 7.29 | 16.07 |
AR.DB.650x2000 | Ring Lock Bay Brace 650x2000mm (2'2") | 7.08 | 15.62 |
AR.DB.610x2000 | Ring Lock Bay Brace 610x2000mm (2') | 6.90 | 15.21 |
AR.DB.3072x2000 | Ring Lock Bay Brace 3072x2000mm | 10.95 | 24.14 |
AR.DB.2572x2000 | Ring Lock Bay Brace 2572x2000mm | 9.89 | 21.81 |
AR.DB.2072x2000 | Ring Lock Bay Brace 2072x2000mm | 8.93 | 19.69 |
AR.DB.1572x2000 | Ring Lock Bay Brace 1572x2000mm | 8.10 | 17.86 |
AR.DB.1400x2000 | Ring Lock Bay Brace 1400x2000mm | 7.86 | 17.33 |
AR.DB.1286x2000 | Ring Lock Bay Brace 1286x2000mm | 7.71 | 17.00 |
AR.DB.1088x2000 | Ring Lock Bay Brace 1088x2000mm | 7.47 | 16.47 |
AR.DB.1036x2000 | Ring Lock Bay Brace 1036x2000mm | 7.41 | 16.34 |
AR.DB.1020x2000 | Ring Lock Bay Brace 1020x2000mm | 7.40 | 16.32 |
AR.DB.880x2000 | Ring Lock Bay Brace 880x2000mm | 7.26 | 16.01 |
AR.DB.732x2000 | Ring Lock Bay Brace 732x2000mm | 7.14 | 15.74 |
AR.DB.3000x2000 | Ring Lock Bay Brace 3000x2000mm | 10.77 | 23.75 |
AR.DB.2500x2000 | Ring Lock Bay Brace 2500x2000mm | 9.74 | 21.48 |
AR.DB.2000x2000 | Ring Lock Bay Brace 2000x2000mm | 8.80 | 19.40 |
AR.DB.1500x2000 | Ring Lock Bay Brace 1500x2000mm | 8.00 | 17.64 |
AR.DB.1000x2000 | Ring Lock Bay Brace 1000x2000mm | 7.38 | 16.27 |
AR.DB.2400x2000 | Ring Lock Bay Brace 2400x2000mm | 9.55 | 21.06 |
AR.DB.1800x2000 | Ring Lock Bay Brace 1800x2000mm | 8.47 | 18.68 |
AR.DB.1200x2000 | Ring Lock Bay Brace 1200x2000mm | 7.60 | 16.76 |
AR.DB.900x2000 | Ring Lock Bay Brace 900x2000mm | 7.28 | 16.05 |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Specification for bowl scaffold support top rod length of not more than 30cm, which is the standard which page specific ah, too lazy to check out, who knows?
- Specification for bowl scaffold support rod top length of not more than 30cm
- Q: What is the horizontal spacing of the wall of the bowl buckle scaffold
- For the double row scaffold with a height of 24m or above, it is necessary to connect the rigid wall with the building. 6.4.5 wall construction shall meet the following requirements: (1) the wall of the wall connecting rod or horizontal reinforcement should be set, when not level settings, and end connections shall be connected by scaffolding, should not be used on cable connection; (2) the wall must be constructed by tensile and pressure. The reinforcement must be matched with the supporting and supporting should be reliable at the top of the concrete ring beam, column structure. Steel wire should be used for more than of the diameter of the steel wire twisted into one, the use should not be less than 2 shares; can also be used not less than 6mm diameter reinforcement. 6.4.6 when the lower part of the scaffolding can not be set up even when the wall can be set up throwing support. Throwing support should be used in long rod is reliably connected with the scaffold, and the ground inclination should be between 45 DEG ~60 DEG; the connection point to the main center node distance should not be greater than 300mm. The support shall be removed before the wall parts are erected. When the height of the 6.4.7 frame is over 40m, and the wind vortex is acting on the wall, the measures of anti roll up wall should be adopted.
- Q: Hiya, I just had a scaffold piercing on the 14th of this month.. and everything was fine but in the last couple of days my ear has become a bit swollen and has broke out into spots. The actual piercing is fine, I found some dry blood on the end of the piercing but I dismissed that as nothing. The piercing doesn't hurt at all but its the itching that's getting to me! :(Any advice please, (bear in mind i shall be going to the doctors)Thanks
- You shouldn't need to see the doctor. You may be having a reaction to the jewelry. Doctors are not very knowledgeable about piercings. In fact, most that I've met are quite biased against them. Swelling with a scaffold piercing is normal. Sometimes it takes a few days to take effect. Go to your piercer and let them take a look at it first. If you're wearing surgical steel you may need titanium. Also make sure you're only using sea salt soaks twice a day to keep it clean. No antiseptic cleaners, witch hazel, alcohol, peroxide, antibiotic ointment, most soaps, etc.
- Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
- The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
- Q: i work in construction.
- Yes!
- Q: hey im 13&very mature&my sister got a scaffold percing&said it hurt like hell ..i want 1 ..2 does it hurt?
- ur 13 nowhere will doit. doesnt hurt that much
- Q: Thinking about getting this peircing done next. I got my first and second peircing on my lobes and neither hurt at all to me (like .5 out of 10). How much does industrial hurt out of 10? Is it a similar pain to lobe peircing? Also how long does it take to heal, until you can take it out and sleep on it?
- For me, I'd rate it's pain level at about a 5. Just all depends on how well you tolerate. It's more uncomfortable than getting a lobe piercing, really not that similar. Mine took about about 6-8 months to heal for changing the jewelry, but took like maybe 2-3 months until I was able to sleep on it again. Good luck if you get it.
- Q: Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
- The utility model also needs to be provided with a scissors support, which aims to ensure the stability of the frame body, avoid the appearance of the slope, improve the safety of the construction, and avoid the occurrence of safety accidents
- Q: What kind body jewlery would match a scaffold piercing?
- Anything as long as you match silver with silver and not with gold
- Q: I recently had a scaffold piercing. It seems to be healing well, however it is still sore.My body tends to reject piercings, so is there anything I can do to help it heal?I am currently using saline solution taking vitamins.
- your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Send your message to us
Steel Ringlock Scaffolding Brace/ Bay Brace / Diagonal Brace CNBM
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords