• Steel Ladder Beam for roof using CNBM System 1
  • Steel Ladder Beam for roof using CNBM System 2
Steel Ladder Beam for roof using CNBM

Steel Ladder Beam for roof using CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Surface: Galvanized

  • Material: High Strength Steel

  • Type: Scaffolding Frame

  • Standard: CE

  • Certificate: ISO

Packaging & Delivery

Packaging Details:Pallet

2.Product Description

Model No: FAS-MF

Product Name: Scaffolding System--Main Frame

3.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube and U bar,

    Specification(mm): 732(W)x1000/1500/2000(L) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order.

3. Also can manufacture it as your requirement 

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Steel Ladder Beam for roof using CNBM

Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q:For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:What kind of insulation materials and equipment are allowed to be imported in China?
One of China Polypropylene board (EPS board) or extruded board (XPS board), extruded board special interface agent
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords