Steel H frame scaffolding High quality 1524mm*1700mm

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Steel H frame scaffolding (PALLETS)

1)size 1524mm*1700mm
2)material Q235  
3)finished painted or galvanized ,powder coated

4)tube size 42mm*2.0mm or 1.8mm and 25.4mm*1.8mm

5)weight of frame 18.5kg or 13KG or as your demand

6)4feet X6 feet or other size can be done also.

7)good quality and good price 

2.Cup-lock Scaffolding Images

Steel H frame scaffolding High quality 1524mm*1700mm


Steel H frame scaffolding High quality 1524mm*1700mm

Steel H frame scaffolding High quality 1524mm*1700mm

Steel H frame scaffolding High quality 1524mm*1700mm

3. What promises can be done by us?

1) If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

 2) If printing required, please advise asap because the whole set need much more time to complete.

 3) Please DO check goods when courier knocks your door and contact us asap if any issue.


4.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the characteristics of Pankou scaffolding
Ottohelix, scaffolding has large load strength, under reasonable mechanics, with a capacity of up to 200KN.Pankou scaffolding saves the amount of steel.
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:Having problems with my scaffold/industrial piercing?
dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
concentration your interest on who's on the scaffold, how they react to the regularly occurring public shaming, and what the reader learns with regard to the character from examining the define of them on the scaffold.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:Scaffolding????
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:What are the common rules for calculating the amount of scaffolding works
General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range