• Steel Coupler Rebar Steel from Jiangsu China under High Quality System 1
  • Steel Coupler Rebar Steel from Jiangsu China under High Quality System 2
  • Steel Coupler Rebar Steel from Jiangsu China under High Quality System 3
Steel Coupler Rebar Steel from Jiangsu China under High Quality

Steel Coupler Rebar Steel from Jiangsu China under High Quality

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Couplers Rebars Steel Tube Made in China

1.Description of Steel Couplers Rebars Steel Tube Made in China:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel from Jiangsu China under High Quality

Steel Coupler Rebar Steel from Jiangsu China under High Quality

2.Advantages of Steel Couplers Rebars Steel Tube Made in China: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Couplers Rebars Steel Tube Made in China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q: i have lived in york for ten years and have been told many times that the minster in york has had scaffolding up for decades and that it has to stay there for political or religious reason there is never any work done or indeed workers on the scaffolding. can anyone shed any light on the matter for me or is it just an urban myth and nothing more than on going restoration.
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q: Which God can tell me what is required, how to get ah?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q: What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q: What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q: Im thinking of getting a scaffold piercing when i am old enough to and ive seen videos of people who have one but it cause bacteria in their ear and if they take it out their ears swell. I want to know if this is a bad piercing to get. Also i have had an allergic reaction to an earring before and im not sure what type of earring it was. Can that affect it as well.
It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.
Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q: What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords