Single Set Horizontal Axis Tracking System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500000 watt
Supply Capability:
5000000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Single Set Horizontal Axis Tracking System

It is a high cost-efficient product that can be widely used in low-latitude regions.


Features:

1. The system, which uses an isosceles triangle bracket as bracket structure and maintenance-free, wind and sand-proof high polymer material bearing moving parts and unique linkage structure, features reliable system stability, low cost and low failure rates. 

2. Compared with traditional fixed-bracket its annual energy output can be increased up to approximately 20 percent - 30 percent. 

3. With exactly the same or even lower cost as fixed-bracket the system is the optimal choice for the establishment of large and medium-sized high-efficiency solar power stations.


Specification:

installed capacity

  1KW—10KW

control method

Light control

time control

light/time control

tracking accurancy

  ≤1°

Azimuth angle

  ±45°

Working wind

   50—70km/h

Max wind resistance

  125—200km/h

Driven power

  DC24V/≤30W

Structural material

  Q  2  3  5

hot-dip galvanized steel

level of protection

  IP65

Quality guarantee

  25Y/2Y

Operating ambient temperature

  -35℃—65℃

Area of net rack

  10—80

Unit weight

  200kg——2000kg


Single Set Horizontal Axis Tracking System


Single Set Horizontal Axis Tracking System


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.
Q:What is the metal material for the RESOLUTE bracket?
If the core of the stent is a lipophilic molecule, it is compatible and firmly wrapped in drugs, in 6 months and longer time a small amount of uniform release of drugs to ensure sustained and stable drug stent effect.
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:Easy to pave the anti-static floor bracket system?
So that the floor flatness, aesthetics, the gap has been a large degree of straightening, while the efficiency of the rapid increase of more than 50%.
Q:What are the benefits of finished stents?
Steel parts and components to achieve modular / standardized production, can improve production efficiency and reduce labor costs; finished stent system easy to install, easy maintenance (parts easy to purchase), shorten the duration, reduce maintenance time and so on.
Q:Specification for installation of fire pipe support
The size and type of the bracket should be based on the actual situation to determine the stent hole should be used to open the hole drilling, is strictly prohibited to use electricity, gas welding openings.
Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range