Single Component Polyurethane Waterproof Painting
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 kg
- Supply Capability:
- 1000000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Single Component Polyurethane Waterproof Coating Introduction
Single-component moisture-curing pure polyurethane waterproof coating is a kind of liquid polymer waterproof material,
suitable for dry and wet base surface construction, solidified into tough and elastic, non-toxic and tasteless waterproof
film after coating. It is a new type of environmental friendly waterproof material without solvent.
Single Component Polyurethane Waterproof Coating Application
•Building roof
•Concrete
•Wall
•Water Tank Structure
•Floor(kitchen floor, bathroom floor ect)
•Underground Tunnel
•Sewerage Structure
•Movement Joint
•Wet Area, Pipes, Sewer & etc.
Single Component Polyurethane Waterproof Coating Advantage
1.water based and solvent based
2.Solid content above 80%
3.Durable performance, UV resistant, ageing-resistant,resistant high and low temperature,antifatigue, withstand constant immersion in water
4.Good splicing performance
5.Operate conveniently, low viscosity
6.Can splicing with concrete and many kinds board stuff
7.Will not change color after used
8.Apply for Roof,Swimming Pool,Tank and more
Single Component Polyurethane Waterproof Coating Specifications
NO. | Items | Ⅰ | Ⅱ |
1 | Tensile Strength MPa≥ | 1.9 | 2.45 |
2 | Elongation at Break %≥ | 550 | 450 |
3 | Tearing Strength N/mm≥ | 12 | 14 |
4 | Bend at Low Temperature°C≤ | -40 | |
5 | Unpermeability0.3MPa 30min | Impermeable | |
6 | Solids Content%≥ | 80 |
Single Component Polyurethane Waterproof Coating photos
FAQ
1. Which payment do you accept?
For you convenience, our payment can be L/C, TT
2. Is free sample available?
We can supply free samples. You'll just need to pay for express cost.
3. How about your quality?
We have strict quality control system, we make testing on incoming raw material and finished products. Your third party testing is also welcomed. With high quality, our products are used on government projects at home and abroad. Our product quality is accepted by clients from all over the world. Warmly welcome your samples requirement or trail order.
- Q: Bathroom first leveling or do waterproof, what is the difference
- 7. The threshold stone is only decorated, do not mistakenly believe that can hold water. In short, each process have to carefully do not leave a hidden trouble to ensure worry. But the reality of the structure, materials, workers, mutual protection and many other unsatisfactory, so that waterproof is a common problem, perhaps set (overall) bathroom by the factory as a whole production test, on-site assembly will solve this common problem.
- Q: Home improvement waterproofing problem
- 2, the ground waterproof layer generally turned 20 cm. Use the shower parts generally do more than 2.2 meters.
- Q: Oriental rain rain waterproof how to
- 2, Oriental rain rain waterproof coating application If the above content can not accurately explain the East rain rain waterproof paint is good, then continue to look at the East Rainbow waterproof coating since the application of this Examples, I believe that most consumers can not say. Oriental Yuhong waterproof coating with its excellent product performance is applied to the Great Hall of the People, China Millennium Monument, the Three Gorges Hydropower Station, Beijing Metro, Capital Airport, Beijing Wuhuan, Sixth Ring, Beijing-Shanghai high-speed, directly under the central grain depot, China Central Television, National Aquatics Center (Water Cube), National ...
- Q: Nanning building waterproof material market where
- This depends on what you need packaging materials, and if it is some packaging rope or paper or process raw materials and other different materials to find a different place, generally sold outside the packaging is more like Nanning near the train station Or the trading market,
- Q: Roof for the insulation, Master roof, using two waterproof construction program
- Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
- Q: What should you pay attention to before the construction of the basement waterproofing membrane?
- Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
- Q: I would like to ask how to do in the warm water above,
- I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
- Q: Why should the use of high pressure perfusion waterproof plugging method
- Due to uneven settlement of buildings and other factors, resulting in deformation of the building structure cracking, leakage phenomenon, for the repair of this situation, you can use a new foreign plugging construction technology - high pressure grouting waterproof repair technology.
- Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
- Second, the completion of the construction of the membrane and the acceptance of qualified, should do the protection of finished products, it is recommended to use cement mortar to do protective layer, construction should pay attention to the surface should be smooth pressure, and set the surface sub-grid, 1 m2. If the use of block material to do the protective layer, the sub-grid area should not be greater than 100 square meters, sub-grid width should not be less than 20mm; if the use of fine stone concrete protective layer, the sub-grid area should not be greater than 36 square meters. Note: Regardless of which protective layer is used, a separation layer should be provided between the waterproofing layer and the protective layer.
- Q: Waterproof material water leakage construction should pay attention to what
- Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.
Send your message to us
Single Component Polyurethane Waterproof Painting
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 kg
- Supply Capability:
- 1000000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords