Scaffolding Accesories Putlog Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
TIA,Tianjin China (Mainland) China (Mainland)

Model Number:
Scaffolding Parts
0.95-1.05kg or as per your request
Galvanized / painted
Scaffolding Part Type:
Scaffolding Couplers
drop forged / pressed
British/German/ Korean/ Japanese etc.

Packaging & Delivery

Packaging Detail:Plastic bags with steel pallet or as your requirment
Delivery Detail:within 25days after the deposit or L/C recevied


1.scaffolding coupler
2. Brand Name: ADTO
3.Brand: ADTO
4.Standard: EN74/BS1139

Scaffolding coupler for Construction

1.Standard:  EN74/BS1139

5.Features of scaffolding coupler:

1.Good bearing capacity

2.Durable & stable

3.Easy to assemble & dismantle

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I need to be guided to supplier of Aluminum Scaffolding?
Please Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:Industrial / scaffold piercings - pierced with rings?
Having one bar can definitely put a lot of pressure on the piercing but it's the best way to go about getting an industrial piercing. It can be a difficult piercing to heal is all. If you get two rings it is very likely that one will slightly migrate in angle and that is going to make it impossible to properly fit a bar through the two holes. Plus, 6-8 weeks would be WAY way way too early to change a cartilage piercing. Try 6-12 months. And an industrial will never reject simply because of the bar, it will reject if it was pierced incorrectly or on someone's ear that is not anatomically correct for the piercing. And I promise, from someone who has had helix piercings done with rings and with straight barbells as well as having one single barbell through my industrial your hair can get caught on them all. If the bar fits properly the balls should fit pretty snugly against your ear.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:How many meters per square meter and the number of steel fasteners
Steel pipes need to be equipped with 210-220 fasteners, 90% of the cross fastener
Q:Little help on Industrial/Scaffold Piercings?
okay, if you do end up getting it, make sure you get it on the side you DONT sleep on. dont let shampoo get on it. be really careful with it. if you have longer hair dont let your hair get caught in it cause it'll get tangled on it and it'll hurt and tug on the bar. it's usually around 40 dollars for it. this piercing requires a long time to heal and it has a high risk of infection. but if you take good care of it, you'll be good (: hope this helpedd.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q:Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:What issues need to pay attention to the construction of high-level scaffolding
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:Can a person get electrocuted if he's holding an exposed wire in one hand and metal scaffolding in the other?
First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range