Ringlock Scaffolding in Construction Q345 Hot Sales

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Q345 Hot Sales Ringlock Scaffolding In Construction 


Product Information:  

• Key Word : Ringlock Scaffold

•Surface Finish: Hot Dipped Galvanized ( H.D.G) Painted   


Material:

Q235B Q345B     


Size: 

48.3mm

• Pipe Wall Thickness: 2.5mm , 2.75mm, 3.0mm, 3.2mm, 3.25mm, 3.8mm, 4.0mm 


Other Details:

• Production Technology : Argon Arc Welding  

• Others Accessories: Ledger, Standard( Vertical), Base Collar,  Steel Plank, Screw Jack etc   

• Loading Information: 25Tons / 20' HQ Conatiner  

• Delivery time: Wthin 30 Days From Order Confirmed Date    

• MOQ : 1000 Pieces

 

Ringlock Scaffolding in Construction Q345 Hot Sales

Ringlock Scaffolding in Construction Q345 Hot Sales

Ringlock Scaffolding in Construction Q345 Hot Sales

Ringlock Scaffolding in Construction Q345 Hot Sales


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
your okorder.com/... and they usually cost about 40$
Q:Introduction of external scaffolding
Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:I would like to ask how much scaffolding steel prices
Hello, you ask this question is not answered, you are building it, I am here to help you check a lot of information on the Internet, here to share with you, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.
Q:What's the film where gene Kelly dances on scaffolding?
I think it's Living in a Big Way.... I could be wrong...
Q:Scaffolding / Industrial Piercing in Birmingham?
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q:Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range