Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t.
Supply Capability:
100000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ringlock Scaffolding 

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. 


Ringlock scaffold has the following features: 


1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection. 
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes




Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Specification of Ringlock Scaffolding


     Ringlock Diagonal Brace Easy Assembly Top Quality Metal

                 Ringlock Diagonal Brace Easy Assembly Top Quality Metal

    

 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

Ringlock Diagonal Brace Easy Assembly Top Quality Metal 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

                                              The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

                                                       The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

                                                               Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

                                         Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG


Accessories


Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Ringlock Diagonal Brace Easy Assembly Top Quality Metal


Packing


Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Inspection

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

    Ringlock Diagonal Brace Easy Assembly Top Quality Metal

       Ringlock Diagonal Brace Easy Assembly Top Quality Metal

        Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Project


Ringlock Diagonal Brace Easy Assembly Top Quality Metal


More Photos

Ringlock Diagonal Brace Easy Assembly Top Quality Metal

Ringlock Diagonal Brace Easy Assembly Top Quality Metal






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:would you consider it homo if someone had a scaffold?
I wouldnt think homo I would think ewwwwww
Q:Specification for bowl scaffold support rod top length of not more than 30cm
JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications page 6.96 forty-first
Q:Found two different bowl buckle scaffold specification JGJ166-2008
Should be a fastener type steel pipe scaffolding, the two are different
Q:hey im 13&very mature&my sister got a scaffold percing&said it hurt like hell ..i want 1 ..2 does it hurt?
ur 13 nowhere will doit. doesnt hurt that much
Q:Scaffolding/Industrial Piercing Questions...?
Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
Q:What is the size of the bowl buckle scaffold?
Bowl buckle type scaffold poleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004
Q:Is there a way to find out when specific scaffolding is scheduled to come down in New York City?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q:scaffolding was put up outside my apartment this morning for repair work to be done to the apartment upstairs?
No you are not within your rights to remove the scaffolding. Call the landlord to see if anything can be done. Or you could read, go for a walk. It is not the end of the world to not have tv.
Q:my scaffolding piercing.. read more?
WTF is a scaffolding? If it's what I hope it is you should poast a link to a pic of it....
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range