Ringlock Scaffolding Brace Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: So, recently I've encountered problems with the amount of excrement I produce. I consulted my doctor and he said I should try Anal Scaffolding. It was fine for the first 2 weeks but recently it has collapsed, causing an retraction of my rectum. Why is this happening? Thanks.
- You need to be examined by your doctor as only an examination could determine the reason why this is happening..............
- Q: In the process of high-rise building construction, bowl buckle type steel pipe scaffolding foundation and foundation treatment should meet the requirements
- In fact, the construction of high-rise building scaffolding over a certain height, should be carried out economic comparison, otherwise, the height of a one-time erection is too high, the cost will be high.
- Q: I really wanna get my scaffold done but I've watched video's of it being done on youtube and I'm absolutely terrified now...a lot of the people getting it done screamed :/ .. please can anyone tell me how painful is it to get done? and afterwards? and also is it always done with a needle??Thanks in advance
- Mine really hurt, but I didn't scream. For the first few days I couldn't sleep on it, I noticed bubbles forming around the ends but, that's normal with piercings with cartilage. Make sure you go somewhere who uses the tube for the needle. When I went, since my ears were small, he used two different needles it lasted too long. But it wasn't worse than my tragus so, I was able to accept the pain.
- Q: I got my industrial pierced about three days ago. The shop I wanted to go to closed so I went to another one that cost a bit more. The guy who pierced it said to only clean it with warm water, but when I got my helix, tounge webbing and angel bites I was told that all new piercings need disinfectant. What are some disinfectants I could use and am I right by doing this or should I listen to the piercer?
- Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
- Q: What are the specifications for the setting of the wheel - fastener scaffold
- The composition of the raw material composition of the wheel buckle scaffolding die: wheel buckle scaffolding is 8-10 times the speed of the ordinary steel pipe fastener, 2-4 times the bowl buckle scaffold, gradually replace the bowl buckle scaffold
- Q: At what height do we need to erect scaffolding?
- Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.
- Q: I NEED THE THREE SIGNIFICANCE OF THE SCAFFOLD IN THE SCARLETT LETTER CAN ANY ONE HELP ME!!!
- just okorder i had to read that book, i hated it.
- Q: Scaffolding step span, span, the vertical rod spacing is how much
- Correct answer, scaffolding construction scaffolding and scaffold decoration is divided into two kinds, the decoration scaffold is divided into single and double row scaffolding and scaffolding scaffolding MyTopHome (scaffolding). Construction scaffolding step distance of not more than 1.5 meters, not more than 1.8 meters from the scaffolding scaffolding.
- Q: The bowl buckle scaffold allows the joint to be in a section
- Look at the situation, the ground is not flat,
Send your message to us
Ringlock Scaffolding Brace Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords