Ringlock Accessory Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q:What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
- Jgj166-2008 is the first safe and technical specification for the construction of steel tubular scaffold
- Q:I need to build something using stainless steel tube or scaffolding tube. What is the cheapest place in the UK to get it ... with no minimum order quantities?Thanks.
- Like molitor said, if someone wants your bike bad enough, there's hardly any way to stop them. However, theives are like roaches; they don't want to be seen and scurry away when they think they're found out. Anything you do to slow them down works in your favor because it urges them to move on to easier pickings. Incidently, every system has its weakness. How good is your chain? Just because a chain is big doesn't mean it's strong. Even cheap Chinese bolt cutters will cut through a really big cheap chain, soft bolt or cheap padlock. Go for the high quality chains used by truckers to bind down loads or the type designed for overhead hoists. They may not be as big as others, but they are really tough and will give bolt cutters a run for their money. If you have bolts anywhere on the chain, use grade 8 and a good, hardened lock.
- Q:Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
- as a builder for over forty years ..i have never seen anybody check the scaffold once it is erected ..and providing it has not been altered it is the scaffolding contractor who is responsible for it ..and its extremely rare for a contractor to have his own scaffolders ..here in the uk they have work strictly to a code of practice and carry a public liability insurance
- Q:I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
- well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
- Q:Iam a student from federal polytecnic damaturu in Nigeria from department of civil engineering.thanks
- 1. ) We really need to paint building and steel to prevent from rust, by then it will help the structure to last long..We all know that rust is one of the problem that loosen the strenght of steel.. 2.) Construction aggregate, or simply aggregate, is a broad category of coarse particulate material used in construction, including sand, gravel, crushed stone, slag, and recycled concrete. Aggregates are a component of composite materials such as concrete and asphalt concrete; the aggregate serves as reinforcement to add strength to the overall composite material.
- Q:The difference between bowl buckle scaffold and fastener scaffold
- 4 according to the form and use of the overlap into(1) single row scaffolding (single row): only a row of pole end, horizontal bar on the scaffolding on the wall.(2) double row scaffolding (double frame): scaffold composed of inside and outside the two rows of the pole and the horizontal bar etc..(3) structural scaffolding: scaffolding for masonry and structural engineering operations.(4) decoration scaffolding: scaffolding for construction work.(4) cantilever scaffold: scaffold for installation or repair of cantilever work.(6) formwork support: a frame for supporting a template and a scaffold material.
- Q:Bowl buckle scaffold steel pipe specifications should be mm
- Bowl buckle scaffold steel pipe specifications are as follows:
- Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
- To determine the spacing between the poles, but these are theoretical things. In fact, the general use of 1200 or 900 of the space. According to the size of the room layout on the line
- Q:Wankou scaffolding steel scaffolding and look like? What is the difference
- Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built,
- Q:What kind body jewlery would match a scaffold piercing?
- Anything as long as you match silver with silver and not with gold
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ringlock Accessory Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords