Reinforced Concrete Slab Cutting Machine

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
20 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Reinforced Concrete Slab Cutting Machine

 

1.   Structure of Reinforced Concrete Slab Cutting Machine:

 

Reinforced Concrete Slab Cutting Machine is widely used in construction projects to cut the Prestressed Concrete Cored Slab meeting tensile strength into the sizes required by the customer. This machine is compact, efficient, convenient and safe for operation as a necessary equipment in cement and concrete prefabrication profession.

 

 2.   Main Features of Reinforced Concrete Slab Cutting Machine: 

 

• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Simple structure, easy operate, less wear parts

 

3.  Reinforced Concrete Slab Cutting Machine Images:


Reinforced Concrete Slab Cutting Machine

Reinforced Concrete Slab Cutting Machine

Reinforced Concrete Slab Cutting Machine



4.  Reinforced Concrete Slab Cutting Machine Specification:

  

Model

Blade Diameter(mm)

Cutting Depth(mm)

Cutting Length(mm)

Main Motor Power(kw)

Rotated Speed(r/min)

Weight(kg)

Overall Dimension(mm)

XQH200-1200

600

200

1200

11

1820

700

2500x1300x1500

XQH300-1200

800

300

1200

15

1440

880

2600x1660x1700

XQH380-1200

1000

380

1200

18

1440

900

2800x1400x1800

  

5. Packing & Delivery

 

•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Reinforced Concrete Slab Cutting Machine

 

6. FAQ:

 

We have organized several common questions for our clients, may help you sincerely

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 

 

7. Why choose us:

 

•  30 years manufacturing experience.

Constitutor of the

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

 Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.

 


 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What forces of production (technologies, machinery, modes of transportation are involved in mercantilism?
Nothing okorder.com/
Q:where can i get the plant layput & list of machinery along with market value?
For what kind of company?
Q:To increase production output during the Industrial Revolution, businesses primarily invested in...?
Output = swifter, greater helpful production approaches. for this reason, equipment. workers have been extremely replaced. advertising and marketing got here later. assembly line sort artwork necessary little or no qualifications. B. .
Q:I have drawings of diffrenet type material to make the small parts of machinery?
Matweb okorder.com
Q:I was wondering if a license from another country (say Ecuador) is valid here in the United States for operating heavy machinery?
Equipment operator license is only valid locally, in the country where it was issued. It would probably be easy to take the test for a US license, but some of the safety requirements will be different, so brush up on the training, and take the test.
Q:where are there heavy machinery operating schools in troy new york?
Here okorder.com/
Q:How do you make an ice cream without machinery?
Get 2 zip lock baggys. 1 gallon and 1 sandwich bag. U put ice cubes in the 1 gallon bag and then your choice of home made ice cream ingredients in the sandwich bag. Put the sandwich bag inside the 1 gallon bag... then... shake it for 10-15 minutes and bowww ice cream
Q:How to improve the mechanical properties of materials?
Such as quenching can improve the hardness of the material, quenching and tempering (quenching and high temperature tempering) can improve the stability and toughness of the material to improve the strength of the material processing performance, surface chrome, can improve the surface hardness and wear resistance, corrosion resistance
Q:I bought an Oasis Machinery Dust Collector. Any free replacement bags?
es okorder.com
Q:What can I talk about in my agriculture machinery speech?
Well...it wouldn't be popular, but it would be eye opening. You could talk about how the tractor companies took draft horses as down payment when they first started up decades ago. The draft horses were then sent off immediately for slaughter. In just a few short years, thanks the the coordinated work by the tractor companies the numbers of available draft horses plunged. That meant that farmers who were unhappy with their tractors, and wanted to go back to using draft horses (or draft mules) were unable to find any for love nor money. That was the beginning of the enslavement to debt of the U.S. farmer. Instead of running a horse that could reproduce itself, farmers now had to go into debt to buy tractors. It meant they worked longer hours (headlights on tractors) to pay for them. No longer did farmers work sun-up till sun-down. Agriculture quickly became a 24 hour a day job. Since the tractor didn't need time to rest, like a horse, it meant longer hours, and purchasing more land (more debt) for the farmer to pay for all the new tractors, and fertilizers that were being pushed on the farmers by agra business companies. Like I said, not a popular speech, but very factual, and something few people realize (even farmers). ~Garnet Permaculture homesteading/farming over 20 years

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range