• Rain (Building Glass-EN1051) System 1
Rain (Building Glass-EN1051)

Rain (Building Glass-EN1051)

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Additional Info:
  • Packing:cartons

  • Standard:en1051-1

  • Origin:china

  • HS Code:70169090

  • Production Capacity:36 MILLION PCS PER YEAR

Product Description

We are the biggest glass blocks supplier in the world, our products quality control system have passed ISO9001, 14000, 28001, EN1051, SGS certified. Our base products GLASS BLOCKS have been sold all over the world.


The glass blocks we can produce and suply:
Clear glass blocks of 190X190X80mm
Blue/green/pink/brown of 190X190X80mm
Clear glass block of 240X115X80mm
Clear glass block of 240x240x80mm
Clear glass block of 190X190X95mm
Clear glass block of 145x145x95mm

Q:and does a building have to be on the bottom of a slope to flood?how can i stop it from flooding if so,
no, but i can see you naked when you shower in that building
Q:What is the difference between screen printing glass and glazed glass? The What is the difference between product performance, production methods, what is the difference
Generally speaking, most of the silk screen glass refers to the glaze glass, such as car glass around the black flowers, as well as architectural glass of various colors or ribbons. Architectural glass up to fake glaze glass is the paint glass, the main difference between the two main performance in the firmness - color glaze can not be scraped with a blade, paint can; color glaze never change color, paint will change, and even peeling off.
Q:IN THE STATE OF FLORIDA CAN A STATE GLASS AND GLAZING CONTRACTOR PULL A BUILDING PERMIT FOR A COMMERCIAL OR RESIDENTIAL BUILDING/
He can not go higher then residential buildings. Anything higher then that would have to work with a building contractor. there limit is anything three stories and stores. A general contractor is unlimited.
Q:If there is no air conditioning at home, how to make the room cooler,
Balcony green, courtyard green. Balcony courtyard green, planting trees and flowers, not only has a high ornamental value, but also the role of regulating the climate, will make the air fresh, cool and pleasant. Because the green plants can shade, but also through the evaporation of leaves to achieve the role of cooling. Data show that in the courtyard balcony planted grapes, morning glory, climbing wall tiger and some flowers, can be attached to the wall cooling 5 ℃ ~ 14 ℃, so that indoor cooling 2 ℃ ~ 4 ℃.
Q:Hello everyone. Ask a question. What is the level of airtightness of glass curtain walls of public buildings? What adjustments?
In the standard state, when the pressure difference is 10pa, the unit opens the slit air permeability q1 and the unit area air permeability q2 as the grading standard.
Q:Building glass curtain wall VR how to tune material
Will be a material balloon VRAYMAP Diffuse fixed, transferred to the white, fuzzy 0.98 Subdivision value 5 Refract transferred to white, IOR 1.517 affect shadow selected to Reflect the MAP Panel selection FALLOFF Type election Fresnel Stainless steel blinn replaced by metal Highlight Level 90 The following 70 to 80 reflect the NONE at the midpoint of the MAP panel Election VRAYMAP
Q:Do you build glass walls to trap the butterfly you set free?
Flutter it is not nice to trap anything period :))))Always set things free and just let them be even the butterflies too :))) You can build glass walls for yourself if so this is what you choose but you have no right to trap anyone in them if they need to fly and be free hehehe my little doggie will stay with me because she loves me hehehe have a great weekend :)))
Q:Information about the new glass Jijiji hurry! Tell me today
Physical tempered glass, also known as hardened tempered glass. It is the ordinary flat glass heated in the heating furnace close to the glass softening temperature (600 ℃), through its own deformation to eliminate the internal stress, and then remove the glass from the furnace, and then the long nozzle to high-pressure cold air blowing glass Both sides, so that it quickly and evenly cooled to room temperature, you can produce tempered glass. The glass is in the internal tension, the external stress state of stress, once the local damage occurs, there will be stress release, the glass was broken into numerous pieces, these small pieces without sharp edges and corners, not easy to hurt.
Q:What are the equipment to build a glass factory?
Need to slice, edging, drilling, cleaning, printing, steel and a series of equipment, the most simple operation of the initial investment of 5 million yuan.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords