• PVC Tube System 1
PVC Tube

PVC Tube

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Meters m
Supply Capability:
3000 Meters per Month m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Certification: CE, RoHS.

 

Main Market: South Africa, South America, Pakistan, Middle East, America

 

We owned a mature group of 150 workers and set up an integrated quality control system to guarantee zero defect rates.

 

Therefore, we have gained high satisfaction rate from our customers worldwide, with over than 8years experience of export sales, our products are popular in the South of America, South and Middle of Africa, Mid-east zone, Pakistan, India , south and east of Asia and so on.

 

SPEC

(diameter)

Packing     (pcs/ban)

Thickness(mm)

Weight    (g/m)

Lenght(m)

φ16

25

0.9

80

2-4

1.2

100

2-4

φ20

25

1.1

105

2-4

1.2

114

2-4

1.3

130

2-4

φ25

25

1.2

150

2-4

1.3

158

2-4

1.4

167

2-4

φ32

10

1.5

260

2-4

 

Q:Wall after opening the wire tube after the request outside the surface of the tube is not less than 15mm, I would like to ask: from the structure of not less than 15mm? Or from the plaster surface is not less than 15mm? More
First to find their own problems, and then find the property to consult. The specific reference is as follows: test the extension there is no volume; and then test the building intercom can also unlock; if not, the next extension of the extension to try again; if the extension is good, then you are broken; On the contrary, the line is problematic. Note: the walkie-talkie requires property professionals to carry out the latter part of the replacement or maintenance, do not operate their own, so that the technology is not enough, lack of tools and improper operation, resulting in more damage.
Q:Buried in the underground PVC threading pipe in the wire was blisters, about two days or so, with air compressor blowing out of the water, so that there is no problem after this circuit? Such as title
Hello, a complete set of monitoring system mainly include: First, the front-end equipment: camera (network type, hemisphere type, pinhole type, standard gun type, integrated type, industrial type, etc.) Second, the transmission equipment: Equipment: dvr or capture card, etc. Fourth, the display device: monitor or splicing screen
Q:Do you need to make a ground wire when installing KBG and JDG tubes?
Optical fiber patch panel ODF fiber optic patch panel OMDF literally can understand that the two kinds of pole pole Gua Gua Gai Geng Geng Geng Jing are largely consistent, all belong to the wiring connection equipment
Q:What is the fire wire pipe laying? What is the galvanized steel pipe?
Fire wire laying is that the wiring circuit is different from the ordinary circuit, it provides the power is when the fire occurs when the ordinary circuit are powered down, it is also for power equipment to provide power, and its The wire type is also different from the ordinary circuit, the general use of refractory wire, and it is the pipe through the protective layer and ordinary different, ordinary threading tube thickness of the protective layer is generally 15mm, and the protective layer of the fire pipe thickness of 30mm. Galvanized steel pipe dark note that the two points, that is deposited pipe material, that is the way the pipe laying.
Q:I buried the dark line when the tube with a 90 degree straight angle elbow, and now no way to wear through, may I ask what way to go through
Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria.......................................
Q:Pipe leakage, not before, starting in March about 30 seconds a drop, slow down on 1 minute more than a drop, half a year intermittent leakage of .4 times, the longest 1 month, sometimes separated by more than 1 month to re-leakage Upstairs, also played over pressure, about 15 to 20 minutes, almost no strange, the master said normal. Upstairs is not often live, a week to live a .2 days. Question 1. Is such a frequency leaking, is the pressure effective? 2. Can the grouting method be used, bad luck will not bring more trouble, for example, go elsewhere in the home leak? 3 Will the cause of the leaking rain or others? I have a house pipe and a building map - CAD, look at the master view. Points are already all family property, and hope to help ~ ~ ~ Thank you thank you. More
Thirty to four to thirty! To see the specific use and load conditions!
Q:But the curved diameter of the inner diameter than the normal small side, so that the water is the pressure of the pipe has an impact? Why, can we talk about in detail, or why should this design, what principle? More
The ground wire must be separated from the power cord, the power of the inlet and outlet should be separated, or will be secondary infection.
Q:Water and electricity embedded in the cast-in-place board, the structural design requirements of the cast iron pipe in the same area shall not appear three wire tube overlap, so we do more than the bend, the leadership told us to do now through the line to draw a square, Signature, I would like to ask the next line of the calculation of the amount of rules is how the calculation, this work we need to do? More
Electric pipe pipe through the wire to calculate the amount of calculation formula: L = (pipe calculation length + wire reserved length) × with the number of cross-section wire. Leadership arrangements, is necessary, need to be calculated according to the workload.
Q:What is the difference between JDG and KBG?
Cables and wires are generally made up of three parts: the core wire, the insulating sheath, and the protective sheath
Q:Will the installation of the socket and switch what are the requirements? How should the wire tube be discharged?
See a lot of electricians, in the choice of power lines, as long as the "manual", I do not know how to do is good, in fact, just remember a few very simple formula, these problems will be solved
We owned a mature group of 150 workers and set up an integrated quality control system to guarantee zero defect rates. Therefore, we have gained high satisfaction rate from our customers worldwide, with over than 8years experience of export sales, our products are popular in the South of America, South and Middle of Africa, Mid-east zone, Pakistan, India , south and east of Asia and so on.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2008
Annual Output Value Above US$100 Million
Main Markets 20.00% Domestic Market
20.00% Africa
20.00% South America
10.00% Eastern Asia
10.00% Mid East
5.00% South Asia
5.00% Central America
5.00% Eastern Europe
3.00% Southeast Asia
2.00% Western Europe
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shenzhen,SHUNDE,GuangZhou
Export Percentage 71% - 80%
No.of Employees in Trade Department 3-5 People
Language Spoken: English, Chinese, Spanish, German, Arabic, Russian
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords