• Prefabricated Steel Structure Industrial  Workshop System 1
  • Prefabricated Steel Structure Industrial  Workshop System 2
Prefabricated Steel Structure Industrial  Workshop

Prefabricated Steel Structure Industrial Workshop

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Prefabricated Steel Structure Industrial  Workshop

 

1.Structure of Prefabricated Steel Structure Industrial  Workshop

 

Prefabricated Steel Structure workshop is one kinds of the normal industrial building in the industry nowadays.Its components are manufactured  in the factory and prefabricated before entering the site,  and the crane can be design and installed in the workshop for producing the products.


2.Main Features of Prefabricated Steel Structure Industrial  Workshop

Easy for Elevating

•Shorter Construction Period
•Safer for Building

•Cheaper

•Envirommental

Stronger Especially on Resist the Earthquake

 

3. Prefabricated Steel Structure Industrial  Workshop Images

 

 

Prefabricated Steel Structure Industrial  Workshop

Prefabricated Steel Structure Industrial  Workshop

 


4. Prefabricated Steel Structure Industrial  Workshop Specification

Design&Engineering Service, Steel Building,Space Frames, Portable Cabins, Tubular Steel Structures,basic building elements(built-up welded H-section , hot-rolled H-section,  channel,  steel column,  steel beam), standard frames,  secondary framing,  roof & wall materials, Tempcon (sandwich) panels

--------------------------------------------------------------------------------------------------------

Project Scope:

industrial plant/workshop/warehouse/factores, airport terminal, highrise building, bridge, commercial center,  exhibition hall, stadium and the like

--------------------------------------------------------------------------------------------------------

Certificate:

 ISO9001:2000 ; ISO14001:2004 and OHSAS18000

--------------------------------------------------------------------------------------------------------

Engineering Design Software:

AutoCAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc

 ------------------------------------------------------------------------------------------------------

5.FAQ of Prefabricated Steel Structure Industrial  Workshop

 

We have organized several common questions for our clients,may help you sincerely: 

 

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

 

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

③How is the workshop construction period?

It is depanded on the steel structure workshop building's material, and the production capacity requirement, normally it is several months.


Q: Real estate, people often say 'case' is what it means
Is the meaning of the scene, also known as the sales case, refers to the sales office site.
Q: What is the gross margin of the real estate industry?
but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
Q: The future of real estate?
From last year to the People's Day, the state introduced a series of control policies to curb the rise in prices
Q: What is the real estate development prospects now?
China's long-term supply of housing market is still tight, the future development trend is getting better.
Q: How is China's housing market in other aspects ?
the degree of supply and demand matching will be improved.the market order will gradually improve.
Q: How is China's housing market trend ?
??Under the supervision of the pressure of competition and the supervision of the government
Q: What is the difference between land valuation and real estate valuation?
based on the land market transaction data, according to the land's economic and natural attributes, according to the quality of real estate, grade and its real economic activities in the general income Situation
Q: What is the main property sales?
new homes and old houses, commercial housing, fund - raising room to do, the scope to be bigger, a region of all houses have the opportunity to do
Q: What is the trend of real estate now?
China's housing market has entered the adjustment period, but will not collapse. The reason is as follows
Q: What kind of factors in our housing market?
And the beginning of this century, China's baby birth is still running high, it is expected that by 2030

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords