HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--020

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the aspects of the risk of real estate investment and development?
Real estate investment development is a dynamic process, both the benefits and risks exist. As the real estate has the location of the fixed and immutable, large investment
Q:How to classify real estate?
The main categories are as follows: 1 by use (function) division. According to this classification criteria, can be divided into residential real estate market and non - residential real estate market two categories.
Q:What is the gross margin of the real estate industry?
but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
Q:What is the difference between land valuation and real estate valuation?
based on the land market transaction data, according to the land's economic and natural attributes, according to the quality of real estate, grade and its real economic activities in the general income Situation
Q:What is the real estate bubble economy?
in fact, The use of assets and its profitability is not interested in. With the rise in prices, often the expected reversal and the price of the crash, which usually leads to financial crisis
Q:What is the meaning of real estate?
The real estate standard simply said that the benchmark land price, refers to a homogeneous area of the same purpose of land the average price of land
Q:Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q:When is the introduction of real estate?
In the early stages of the beginning of the eighties, the first control is in 93 years
Q:What is the real estate from the law?
that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.
Q:Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range