HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--015

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the aspects of the risk of real estate investment and development?
In general, risk is a combination of a variety of negative deviations that can lead to consequences and predictions of future behavioral decisions and objective uncertainties
Q:What are the categories of real estate?
As the real estate is composed of land and ground buildings, structures, for land and housing can be classified according to the following methods:
Q:How is the real estate sales invoice open?
the first payment, the mortgage to open the invoice, pay the time to open the invoice
Q:Determine what long-term factors in our housing market?
First, the population factor. That is, with the increase in population, the demand for housing will increase
Q:What is the impact of the economic environment on real estate?
From the demand and transactions, it is expected that some of the second-tier cities in 2010 is expected to rise in house prices and the impact of insufficient supply will decline
Q:How can we do real estate?
So to become a top sales staff, we must first learn how to maintain a positive attitude
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:What are the real estate management professions?
Real estate management professional, that is, real estate management and management professional
Q:What is the main property sales?
Single-handedly for a real estate such sales, the scope is not very wide, often finished a real estate will be assigned to another real estate
Q:What is the red line in the real estate project?
The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range