• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006 System 4
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--006

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q: China's real estate market began to develop rapidly is what year
China's real estate boom and rapid development began in 1998, the housing system monetization reform.
Q: What are the aspects of the risk of real estate investment and development?
In general, risk is a combination of a variety of negative deviations that can lead to consequences and predictions of future behavioral decisions and objective uncertainties
Q: What is the status quo of China's real estate market?
from 20 years of real estate development process, the real estate industry has gradually entered a standardized and institutionalized road
Q: Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit
Q: What is the real estate level market secondary market three market
The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
Q: What is the meaning of the term in the real estate?
Washing dishes generally refers to the 2 hand room. A district in a break time will have owners to take their own house out to sell
Q: The future of real estate?
nterest rate plus reserve ratio, the country eight, the purchase order, 10 million resettlement room hard targets
Q: What is the real estate development prospects now?
Although the short term, the real estate market because the price is too high lead to lack of effective demand
Q: Real estate in the "five card" which five?
Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
Q: How to classify real estate?
According to the different needs, can be from different angles on the real estate market classification

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches