HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: China's real estate market began to develop rapidly is what year
- China's real estate boom and rapid development began in 1998, the housing system monetization reform.
- Q: What are the aspects of the risk of real estate investment and development?
- long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks
- Q: What is the status quo of China's real estate market?
- from 20 years of real estate development process, the real estate industry has gradually entered a standardized and institutionalized road
- Q: Real estate, people often say 'case' is what it means
- Case security, usually property companies or real estate recruitment of security personnel, specifically responsible for a district or a property area of security w
- Q: What is the real estate industry?
- the transfer of state-owned land use rights, real estate development and redevelopment, such as the acquisition of land, demolition resettlement
- Q: What is the gross margin of the real estate industry?
- in order to control the risk of developers In order to return as soon as possible funds will sacrifice part of the profits of advertising costs by 1-1.5% of total sales
- Q: Real estate in the "five card" which five?
- Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
- Q: How is China's housing market trend ?
- ??Under the supervision of the pressure of competition and the supervision of the government
- Q: What is the trend of real estate now?
- First, real estate is China's pillar industries, the Government does not allow house prices collapse.
- Q: What kind of factors in our housing market?
- thus promoting the development of the real estate industry. This factor can be seen from the history of population development and housing history
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches