HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--002

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the real estate level market secondary market three market
The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
Q:What conditions should a real estate agent have?
Pressure capacity. Putting your own position, correct attitude, face the pressure, bear the challenge is every real estate agent
Q:How can we do real estate?
Personnel engaged in real estate sales should be committed to the development of individuals and undertakings
Q:What is the status quo of China's real estate market?
At present, China's real estate industry by the economic environment, political law, social and cultural and technological environment and other aspects of the tremendous changes
Q:What is the meaning of real estate?
Real estate is the general term for real estate and property, including permanent buildings on land and land and the rights derived therefrom
Q:How is the real estate industry like?
real estate intermediary services, including real estate consulting, valuation and brokerage agents, property management.
Q:When China introduct the real estate?
Then the market to further recovery and development, 97,98 years when they met the Asian financial crisis
Q:Real estate business, when to carry forward the cost?
How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
Q:What kind of factors in our housing market?
they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate
Q:What is the red line in the real estate project?
The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range