HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--014
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:Real estate business, when to carry forward the cost?
- How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
- Q:What is the real estate bubble economy?
- so as to attract new buyers - these people are generally the sale of assets for profit speculators
- Q:What are the specific real estate stocks
- Real estate shares refers to the listed companies, real estate projects for the company's main business stocks
- Q:What is the difference between land valuation and real estate valuation?
- taking full account of socio-economic development, land use, land expected benefits and land use policies and other factors on the impact of land revenue
- Q:What conditions should a real estate agent have?
- especially just out of the school to work on the young people should have the ability
- Q:What is the real estate from the law?
- that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.
- Q:According to the use of housing classification?
- 1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
- Q:What is the land deed tax rate for real estate?
- donation and exchange, housing sale, house donation and house exchange need to pay deed tax; In the current, real estate enterprises to pay land tax is 3%.
- Q:How is China's housing market in other aspects of the trend ?
- the future price of the housing market in our country will gradually become reasonable and the house price income will be higher than that of entering into a maintainable space.
- Q:Kentucky is selling real estate how to understand?
- KFC's long-term business plan, the basic business will be the sale of KFC's various branches to the various partners
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--014
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products