Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.


If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.


2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.


4. Packing choice:


(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.


(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:


 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to classify real estate?
Residential real estate market can be further divided into ordinary residential market, high - end apartment market, villa market
Q:What is the characteristics of real estate?
(A) the location of the fixed and immutable.(B) the use of long-term.
Q:China's real estate market began to develop rapidly is what year
1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
Q:What is the characteristics of real estate prices
real estate prices, including the following six points,Real estate prices have obvious price characteristics
Q:What is the impact of the economic environment on real estate?
The economic cycle determines the effective demand for real estate. The effective demand of the real estate market is limited by the actual purchasing power of the consumers
Q:What is the real estate development prospects now?
so that supply is greater than demand, but in the medium and long term, the supply is still tight.
Q:Real estate, people often say 'case' is what it means
Such as the case of sales salesman is known as the new sales of commercial housing sales office or sales lady.
Q:When China introduct the real estate?
from the beginning of 99 the real estate market into a new stage of market-oriented.
Q:What are the real estate management professions?
the professional training of moral, intellectual, physical and aesthetic development
Q:What kind of factors in our housing market?
And the beginning of this century, China's baby birth is still running high, it is expected that by 2030

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range