Precision casting scaffolding fitting good quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging & Delivery

Packaging Detail:Paper carton, Wooden box, Steel pallet or Customized or according to the customer request.
Delivery Detail:5-30 days or according to the customer request.

Specifications

1.17 years of industry experience. 
2.ISO9001. 
3.Small order accepted

Inspection:

1. First of all the whole quality control management has been carried out during the entire process of manufacture with the assistance of computer and other numerical control equipment, which includes the raw material, production process control, final product quality control.

2. Third party inspection available upon requirement.

Our many Main Export Market:

1. There are more than 50 customers all over the world.

2. Exported to U.S.A, U.K, Germany, Italy, Japan, Swiss, Australia, Korea, and South-east Asia. All of products are manufactured in accordance with the U.S, Japan and Germany standards.

Our target:

To supply at a competitive and reasonable price, acceptable and stable quality, circumspect and satisfactory service. Punctual delivery time.

Our Competitive Advantages:

1. Stable process;

2. Disciplined peoples and operation;

3. The best product features;

4. Product performance;

5. Advanced machining and inspecting equipment;

6. Prompt Delivery;

7. Quality control system;

8. Service;


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q:What is rolling scaffolding?
well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
Q:Key points for safety of portal scaffolding
2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
Q:The relevant provisions of the demolition of the external wall scaffold:
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
Mobile scaffolding in general are on the basis of rent by the day
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
Had a hooker climb up the ladder to the 3ed floor one time....didn't stay long though!
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
Gosh Industrial do hurt I'm not going to lie. Cartilage piercings don't hurt. But industrials are really hard to take care of. If you can handle pain then get it. They're worth it but they do hurt.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat