Open farming and light conplementation support system

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Farming and light complementation mounting system


Make full use of land source,and perfectly combine new agriculture and new energy. Large scale orderly lay,easy installation,easy conmination.triangle suppore,safe and stable,maintenance-free,strong wind-resistance.

   

The performance features of the open farming and light complementation support system

1. Top is open type PV power station and the new crops and Chinese herbal medicine could be planted on the lower part ground.

2. Make full use of land source and perfectly combine new agriculture and new energy.

3. Large scale orderly lay; easy installation; easy combination.

4. Triangle support, safe and stable, maintenance-free, strong wind-resistance.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:How does the hydraulic support work
he hydraulic support in the course of the work not only to be able to reliably support the roof and should be able to move along with the propulsion forward movement, requiring hydraulic support must have up, down, push, move four basic movements,
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:What is the support frame at the bottom of the car?
This suspension is widely used in front and rear suspension of trucks. SUV rear suspension also uses steel leaf spring non-independent suspension. It is used in the middle of the U-bolt bolts will be fixed on the axle. Suspension front for the fixed hinge,
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:What are the benefits of finished stents?
The main applications are mainly used in the construction of water supply and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway stent system and other systems.
Q:Specification for installation of fire pipe support
The size and type of the bracket should be based on the actual situation to determine the stent hole should be used to open the hole drilling, is strictly prohibited to use electricity, gas welding openings.
Q:What is the full support system
The biggest advantage of the construction of the stent method is the need for large-scale lifting equipment, the drawback is the construction of the stent template consumption, long duration, the mountain bridge and high pier has great limitations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range