Manual operation 12m concrete placing boom
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q: How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
- Q: How to fit the cloth rod of the distributor?
- With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
- Q: What do concrete pumps and fabrics mean?
- Automobile pump flexible tubing can flexibly rotate 360 degrees, the body shift is also very convenient, the pumping efficiency is relatively high, but the cost is more expensive.
- Q: what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q: What are the weekly inspection items for concrete spreader?
- Check the wear of the pipe, the arm thickness is less than 2mm, should be replaced in a timely manner
- Q: What is the working principle of the distributor?
- The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
- Q: How to distinguish tower type distributor and general distributor?
- The steel spreader and the circular pipe distributing machine of the general distributing machine are all simple structures,
- Q: What is the structure of a concrete distributor?
- The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
- Q: What is the concrete distributor?
- Hydraulic cloth machine, manual cloth machine (also divided into 12 meters, 15 meters, 18 meters three kinds)
- Q: What's the design plan of the concrete spreader?
- The belt conveyor head sweeper is designed for the special requirement of conveying concrete and cleaning mortar. The scraper is made of hard alloy material, with a rectangular section, and it does not hurt the adhesive tape and the mortar loss is small
Send your message to us
Manual operation 12m concrete placing boom
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords