Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual 12m concrete placing boom for sale
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q:What is a fixed concrete distributor?
- Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
- Q:How to maintain the concrete spreader?
- The spiral blade edge of the cloth is inlaid with welded alloy wear-resistant blocks, and the spiral shaft can be operated normally for 10 months. The spiral shaft is designed to be easy to assemble and disassemble
- Q:what's the difference between the fabric pump and boom pump?
- The inner climbing type distributor is not limited by height
- Q:What is the Hand operated concrete distributor?
- It effectively solves the problem of pouring material into the wall, and plays an important role in improving the construction efficiency and reducing the labor intensity
- Q:What are the weekly inspection items for concrete spreader?
- The conveying straight pipe and the 90 degree bent pipe on the rack shall be rotated 180 degrees after the completion of a certain amount of transportation so as to increase the service life.
- Q:How to fit the cloth rod of the distributor?
- Check whether the bolts of the rod are fully tightened and whether the shaft is normal
- Q:What is the structure of a concrete distributor?
- Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
- Q:What's the design plan of the concrete spreader?
- Imported cloth machine (tire belt machine) is based on heavy duty truck chassis, or cross-country tire crane as chassis. The distribution machine patent uses the self-propelled crawler crane as the chassis, forming the structure of articulated upper material belt conveyor + crawler chassis + telescopic cloth belt conveyor, which is the first in China
- Q:What is the working principle of the distributor?
- The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
- Q:How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords