Self-Climbing Concrete Placing Boom HG28M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
The placing boom has a Z-shaped boom assembly with three foldable sections, which can swing through 360 degrees while luffing, folding/unfolding, thus allowing it to place concrete to form walls, pipes, columns, piles and other vertical structures without confined placement areas.
The boom assembly’s luffing; folding/unfolding and swinging are carried out hydraulically with buttons. The hydraulic and electrical system feature overload protectors, flow controls, alarms, phase sequence protectors and so on, which ensures the placing boom to have reliable performance, easy and smooth operation, and high safety.
Scope of Application of the Equipment
The HG28A concrete placing boom is a concrete placer for combined use with a concrete pump in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.
This equipment can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The equipment is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.
Product Advantages:
OKorder's Concrete placing boom Channels are durable, strong, and safety.
Main Product Features:
· Premium quality
· Prompt delivery & seaworthy packing (20-40 days after receiving deposit)
Reliable performance
Easy and smooth operation
High safety.
· Professional Service
· Competitive pricing
Product Specifications:
Dimensions and masses of the complete machine and its major components
Model | HG28A-3R | |
Delivery pipe dimension (outside diameter×thickness) JJ83(mm×mm) | Φ133×4.5 | |
Delivery hose dimension (inside diameter×length) (″×mm) | 5″×3000 | |
Radius of placing boom(m) | 28 | |
Stationary height(to the join between the end of the boom and swivel table) (m) | 22.6 | |
Hydraulic foldable arms(m) | 1st section | 10.8 |
2nd section | 9.2 | |
3rd section | 8.0 | |
Boom articulation(°) | 1st section | 0°~86° |
2nd section | 0°~180° | |
3rd section | 0°~180° | |
Slewing range(°) | 360 | |
Power of motor(kW) | 11 | |
Pressure of hydraulic system (MPa) | 28 | |
Type of hydraulic oil | ESSO NUTO H46/H32 | |
(m)Interval of climbing frame | Climbing | 3.0~4.2 |
Placing concrete | 6.0~8.4 | |
Resting | ||
Mode of operation | Cable remote control Radio remote control | |
Power | 380V/50Hz | |
Wind speed | Placing concrete | ≤13.8m/s |
Climbing | ≤7.9m/s | |
Working temperature | -20~48℃ |
FAQ:
Q1: How to control the Placing Boom?
A1: The control system has two control modes for the user's selection: wireless remote control, and panel control.
Q2: How do we guarantee the quality of our products?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce some Concrete Placing Boom according to customers request?
A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
Images:
- Q:What is a fixed concrete distributor?
- Internal climbing concrete distributing machine is a kind of distributing equipment for high-rise building concrete construction. The ship borne concrete distributor is a special ship loading equipment for construction and design of harbors and docks
- Q:what's the difference between the fabric pump and boom pump?
- The spreader is mounted according to the height of the building, and the boom pump can only be used for a lower building
- Q:What is the Hand operated concrete distributor?
- Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
- Q:What are the weekly inspection items for concrete spreader?
- The conveying straight pipe and the 90 degree bent pipe on the rack shall be rotated 180 degrees after the completion of a certain amount of transportation so as to increase the service life.
- Q:How to fit the cloth rod of the distributor?
- With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
- Q:What is the structure of a concrete distributor?
- A composite movement consisting of two parts of a rotating frame covers all cloth radius points
- Q:What's the design plan of the concrete spreader?
- This design makes the cloth machine walking can be designed like the cloth machine when walking will be required to drag on the tape machine in the tail walking without disassembly will drag on the tape machine in the tail walking without disassembly, or will carry on the tape machine walking in fabric tape machine. The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes.
- Q:What is the concrete distributor?
- According to the pouring concrete construction environment different and individual requirements, has designed a climbing and walking type, ship type, manual type and other models for the user, the formation of HG series concrete mixer is currently the world's most complete specifications
- Q:What is the working principle of the distributor?
- In order to avoid the vibration disturbance of slab steel tubing, tubing must be located in the steel frame, steel bunk put wood as a springboard to the supporting surface, concrete pouring, pouring the casting from front to back, remove bracket until the Jiaowan demolished floor bracket
- Q:How to distinguish tower type distributor and general distributor?
- No frame structure. Its stability and service life are all behind the tower cloth machine
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Self-Climbing Concrete Placing Boom HG28M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords