• Light Duty Adjustable Steel Prop with Dip Galvanized System 1
  • Light Duty Adjustable Steel Prop with Dip Galvanized System 2
Light Duty Adjustable Steel Prop with Dip Galvanized

Light Duty Adjustable Steel Prop with Dip Galvanized

Ref Price:
$25.00 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Light Duty Steel Prop Description 

Adjustable steel Prop is applied to vertically support system in the construction to support the timber beam and formwork,such as the floor construction.There are two typesLight Duty and Heavy Duty.

Normally,Raw Material is Q235 Steel with Dip Galvanized

Steel Prop is mainly made up of bottom plate,outer tube, inner tube, swivel nut,cotter pin,upper plate and the accessories of folding tripod,head jack, the structure is simple and flexible.

 

2.Main Features of Light Duty Steel Prop

Steel Prop could be adjusted to required height according to the different height of the constructions.

Adjustable Steel Props
1)Different type and size for slab supporting
2)Easy to operate
3)Quality control
4)Efficient

3.Light Duty product pictures:

   Light Duty Adjustable Steel Prop with Dip Galvanized

4.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1How many Steel Prop your company have

Here comes our 5 types of Scaffolding systems:

-According to the Dutythere are Light Duty and Heavy Duty.

-According to surface treatmentthere are PaintingGalvanizedand Hot Dip Galvanized.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q: How to set up the temporary structure of the external structure of the balcony on the two structure
Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.
Q: Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q: For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
In order not to be involved in the whole system due to local errors, the scaffold must be separated from the formwork support, forming a stable system.
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
Q: I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q: Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
mine told me to twist it....i twist it like every day haha. nothing bad has happened
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q: Because my friend wants it done but isn't sure :)
In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords